1-01 27 AVENUE, Queens, NY, 11102 · New York City · 10 total events
full demolition of 10 story structure, using hand held and mechanical means within, and then full mechanical from grade.
CONVERSION OF ENTIRE WET STANDPIPE SYSTEM TO DRY PRESSURIZED STANDPIPE SYSTEM ON CELLAR, FLOORS 1-9 PRIOR TO FULL DEMOLITION OF BUILDING FILED UNDER SEPARATE DOB APPLICATION AND REMOVAL OF STANDPIPE SYSTEM BY FLOOR DURING DEMOLITION.
INSTALLATION OF NEEDLE BEAM FOR DEMOLITION WORK AS PER PLANS. NEEDLE BEAM SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. DEMOLITION IS FILED UNDER SEPARATE APPLICATION.
Install plywood construction fence
INSTALL MEDIUM DUTY SCAFFOLDING FOR DEMOLITION WORK AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
installation of chute to lower debris from floor to floor and mechanical means to assist
Installation Of Temporary Single Personnel/Material Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
EES will be attached to pipe scaffolding system and the perimeter of the building; starting from topmost section of the scaffold, and will be moved laterally with progression of demo.
REMOVAL OF NON-LOAD BEARING INTERIOR PARTITIONS, CEILINGS, FLOORS, FINISHES AND MECHANICAL SYSTEMS, BOILERS, ELEVATORS AS INDICATED. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY.