995 5 AVENUE, Manhattan, NY, 10028 · New York City · 237 total events
plumbing work for office fit out for Cumming Group on 12th floor
Sprinkler work for office fit out for Cumming Group on 12th floor
General construction for BMO on marketing floors 15 & 33 (construction floors 14 & 32)
Mechanical work for office fitout for Cumming Group on 12th floor
General construction for office fit out for Cumming Group on 12th floor
Temporary platform for NYE Broadcast on the terrace. Removed at the end of the programing. No changes to existing structures, use or egress.
removal of sprinklers at infill area at 11 and 12th floors
demolition to existing ductwork at infill location - not installing anything new under this application.
infill slab from stair removal between 11 and 12th floors
REMOVE EXISTING STAIR BETWEEN THE 12TH AND 11TH FLOORS. SLAB OVER OPENING. REMOVE EXISTING STADIUM PLATFORM ON 11TH FLOOR. INSTALL NEW RAISED FLOOR WHERE STAIR / PLATFORM IS REMOVED AND NEW FLOOR INFILL.
ERECT 2 ILLUMINATED WALL SIGNS AND 2 NON-ILLUMINATED PANELS ON W 42ND STREET. ACCESSORY TO H&M
ERECT (2) ILLUMINATED ACCESSORY BUSINESS WALL SIGNS AND (2) NON-ILLUMINATED ACCESSORY BUSINESS PANELS. ACCESSORY TO H&M
Erect safety netting for maintenance including replacement & installation of new modules.(South Elevation) See CCD1- Commissioner Rebholz dated 8/14/13 Control # 29022 for previous sign being erected. No change of use, egress or occupancy
Erect safety netting for maintenance including replacement & installation of new modules. (North Elevation) See CCD1- Commissioner Rebholz dated 8/14/13 Control # 29022 for previous sign being erected. No change of use, egress or occupancy
Erect safety netting for maintenance including replacement & installation of new modules. (East elevation) See CCD1- Commissioner Rebholz dated 8/14/13 Control # 29022 for previous sign being erected. No change of use, egress or occupancy
Erect safety netting for maintenance including replacement & installation of new modules. (West Elevation) See CCD1- Commissioner Rebholz dated 8/14/13 Control # 29022 for previous sign being erected. No change of use, egress or occupancy
General construction for Rabobank on 8th floor
Sprinkler work for Rabobank on 8th floor
Plumbing work for Rabobank on 8th floor
Mechanical work for Rabobank on 8th floor
FILING HEREWITH PLANS FOR GENERAL CONSTRUCTION WORK AND REMOVAL OF PA SPACE ON THE 36TH FLOOR ON C OF O. INCREASING NUMBER OF PEOPLE. FLOOR WILL BE OFFICES ONLY - NO PA SPACE. THERE WILL BE NO CHANE IN EGRESS UNDER THIS APPLICATION.
Sprinkler work for Bank of Montreal on 9th floor
General construction for Bank of Montreal on 9th floor
Filing herewith plumbing work as per plans filed herewith. No change to use, egress or occupancy.
Mechanical work for Bank of Montreal on 9th floor
Filing herewith modification to the existing sprinkler system as per plans filed herewith. No change to use, egress or occupancy.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 18 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B.
Filing herewith mechanical work as per plans filed herewith. No change to use, egress or occupancy.
General construction for Bank of Montreal on construction floors 30 & 31 (marketing floors 31 & 32)
Mechanical work for Bank of Montreal on construction floor 30 (marketing floor 31)
Installation of large scale lighted wall panel display in the escalator atrium of H&M Times Square NYC.
Filing herewith interior demo. and renovation on the 5th FL. as per plans filed herewith. No change to use, egress or occupancy.
Replace HVAC unit for the 17th floor IT room. No change in use egress and occupancy.
Standpipe work for interior fitout of H&M Store US0400
Mechanical work for interior fitout of H&M Store US0400
Plumbing work for interior fitout of H&M Store US0400
Structural work for H&M Store US0400 for support of mechanical equipment platforms, new opening in mezzanine/demo portion of mezzanine. Floor infill over existing stair to be demoed.
General construction for interior fitout of H&M Store US0400
Temporary Sprinkler Loop during interior renovation of H&M Store US0400
Sprinkler work for interior fitout of H&M Store US0400
INSTALLATION OF A TEMPORARY SCAFFOLD TYPE WORK PLATFORMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORMS INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33
removal of all plumbing fixtures in employee breakrooms and toilet rooms
Erect safety netting for maintenance including replacement & installation of new modules. (North Elevation) See CCD1- Commissioner Rebholz dated 8/14/13 Control # 29022 for previous sign being erected. No change of use, egress or occupancy
Erect safety netting for maintenance including replacement & installation of new modules. (West Elevation) See CCD1- Commissioner Rebholz dated 8/14/13 Control # 29022 for previous sign being erected. No change of use, egress or occupancy
Erect safety netting for maintenance including replacement & installation of new modules. (East elevation) See CCD1- Commissioner Rebholz dated 8/14/13 Control # 29022 for previous sign being erected. No change of use, egress or occupancy
Erect safety netting for maintenance including replacement & installation of new modules.(South Elevation) See CCD1- Commissioner Rebholz dated 8/14/13 Control # 29022 for previous sign being erected. No change of use, egress or occupancy
Mechanical work to include removal of all existing HVAC systems, ductwork and piping during interior demolition for H&M Store US0400
non-structural interior demolition for H&M Store US0400
sprinkler
Retail staircase demo