995 1 AVENUE, Manhattan, NY, 10022 · New York City · 189 total events
SPRINKLER MODIFICATIONS ON 40TH IN CONJUCTION WITH ALT-1 AS INDICATED ON PLANS FILED HEREWITH.
SPRINKLER WORK ON ASSOCIATED PIPING AS SHOWN ON PLANS FILED HEREWTIH
PLUMBING WORK ON ASSOCIATED PIPING AS SHOWN ON PLANS FILED HEREWITH
MECHANICAL WORK AT 31ST FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
GENERAL CONSTRUCTION RELATED TO INTERIOR OFFICE RENOVATION AT THE 31ST FLOOR INCLUDING DEMO OF EXISTING & CONSTRUCTION OF NEW PARTITIONS, FINISHES, DOORS, CEILING AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY
New exhaust hoods in place of existing, reconnect new hood to existing ductwork, vents and makeup air units.
PLUMBING MODIFICATIONS ON 25TH & 26TH FLOOR AS SHOWN ON PLANS FILED HEREWITH
MECHANICAL WORK ON 25TH & 26TH FLOORS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
MODIFICATIONS TO AN EXISTING SPRINKLER SYSTEM AS SHOWN ON PLANS FILED HEREWITH. TEMP LOOP INSTALLATION AND REMOVAL
STANDPIPE WORK AT FLOORS 25 & 26 ON ASSOCIATED PIPING AS SHOWN ON PLANS FILED HEREWITH, TO INCLUDE NEW AUZILIARY FIRE HOSE CABINET INSTALLATION
SPRINKLER MODIFICATIONS ON 40TH FLOOR AS INDICATED ON PLANS FILED HEREWITH
SPRINKLER MODIFICATIONS ON 46TH FLOOR AS INDICATED ON PLANS FILED HEREWITH
GENERAL CONSTRUCTION RELATED TO INTERIOR OFFICE RENOVATION AT THE 25TH & 26TH FLOORS INCLUDING DEMO OF EXISTING & CONSTRUCTION OF NEW PARTITIONS, FINISHES, DOORS, CEILING AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY
Modification to existing HVAC systems as per plans filed. No change in use, egress or occupancy.
Removal and renovation of non-load bearing partitions and interiors as per plans filed. No change in use, egress or occupancy.
Modification to existing plumbing and sprinkler systems as per plans filed. No change in use, egress or occupancy.
Modification to existing plumbing and sprinkler systems as per plans filed. No change in use, egress or occupancy.
TO INSTALL TEMPORARY CONSTRUCTION FENCE.
MECHANICAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION TO EATING AND DRINKING ESTABLISHMENT ('MOMOYA'). MODIFY EXISTING HVAC SYSTEM DUCTWORK AND KITCHEN EXHAUST. INSTALL MAKEUP AIR UNIT. GC FILED UNDER M01217117-I1.
SPRINKLER WORK IN CONJUNCTION WITH INTERIOR RENOVATION TO EATING AND DRINKING ESTABLISHMENT ('MOMOYA'). MODIFY EXISTING SPRINKLER SYSTEM. INSTALL AND RELOCATE SPRINKLER HEADS. GC FILED UNDER M01217117-I1.
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION TO EATING AND DRINKING ESTABLISHMENT ('MOMOYA'). INSTALL PLUMBING FIXTURES AND PIPING. GC FILED UNDER M01217117-I1.
INTERIOR RENOVATION TO EXISTING EATING AND DRINKING WITHOUT DANCING AND ENTERTAINMENT(A-2). WORK TO INSTALL PARTITION WALL AND MILLWORK. PLUMBING, MECHANICAL, SPRINKLER & ELECTRIC WILL BE FILED UNDER SEPARATE APPLICATION.
Modification to existing plumbing systems and fixtures as per plans filed herewith. No change in use, egress or occupancy.
plumbing work during interior demolition on 47th floor
MECHANICAL WORK ON 39TH FLOOR (PARTIAL) AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
SPRINKLER MODIFICATIONS ON 39TH FLOOR (PARTIAL) RELATED TO THE REMOVAL OF EXISTING SPRINKLER HEADS AND ASSOCIATED PIPING AND INSTALLATION OF SPRINKLER HEADS ON ASSOCIATED PIPING AS SHOWN ON PLANS
GENERAL CONSTRUCTION RELATED TO INTERIOR OFFICE RENOVATION AT THE 39TH FLOOR (PARTIAL), INCLUDING DEMO OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS, DOORS, CEILING, AND FINISHES AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY
MECHANICAL WORK ASSOCIATED WITH ALT-1 CHANGE OF USE SPACES ON 40TH AND 48TH FLOORS AS INDICATED ON PLANS FILED HEREWITH.
Alt-1 for change of use at 40th and 48th floors to create new assembly spaces (meeting rooms) to be of non-simultaneous use with office use on rest of floor. Obtain a new C of O
SUBSEQUENT STRUCTURAL WORK ON FLOORS 40TH AND 48TH ASSEMBLY SPACES IN CONJUCTION WITH ALT-1 CHANGE OF USE
PLUMBING MODIFICATIONS ON 40TH FLOOR AS INDICATED ON PLANS FILED HEREWITH.
PLUMBING MODIFICATIONS ON 46TH FLOOR AS INDICATED ON PLANS FILED HEREWITH
PLUMBING MODIFICATIONS ON 48TH FLOOR AS INDICATED ON PLANS FILED HEREWITH
PLUMBING MODIFICATIONS ON 49TH FLOOR AS INDICATED ON PLANS FILED HEREWITH
MECHANICAL WORK ON 40TH FLOOR AS INDICATED ON PLANS FILED HEREWITH.
GENERAL CONSTRUCTION RELATED TO INTERIOR OFFICE RENOVATION AT THE 40TH FLOOR INCLUDING PARTITIONS AND FINISHES AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY ON THIS APPLICATION. RELATED JOB #S M01095380, M01095409, M01095412
SPRINKLER MODIFICATIONS ON 48TH FLOOR AS INDICATED ON PLANS FILED HEREWITH
GENERAL CONSTRUCTION RELATED TO INTERIOR OFFICE RENOVATION AT THE 48TH FLOOR INCLUDING PARTITIONS AND FINISHES AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY ON THIS APPLICATION
MECHANICAL WORK ON 48TH FLOOR
MECHANICAL WORK ON 49TH FLOOR AS INDICATED ON PLANS FILED HEREWITH
GENERAL CONSTRUCTION RELATED TO INTERIOR OFFICE RENOVATION AT THE 49TH FLOOR INCLUDING PARTITIONS AND FINISHES AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY ON THIS APPLICATION
MECHANICAL WORK ON 46TH FLOOR AS INDICATED ON PLANS FILED HEREWITH
GENERAL CONSTRUCTION RELATED TO INTERIOR OFFICE RENOVATION AT THE 46TH FLOOR INCLUDING PARTITIONS AND FINISHES AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY ON THIS APPLICATION
STANDPIPE WORK FOR INSTALLATION OF NEW FIRE HOSE CABINET ON 49TH FLOOR AS INDICATED ON PLANS FILED HEREWITH
SPRINKLER MODIFICATIONS ON 49TH FLOOR AS INDICATED PLANS FILED HEREWITH
Interior Alteration of the 8th floor space for bank of america
Removal of furniture and addition of 4 offices
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING VERIZON.
ERECT ILLUMINATED ACCESSORY BUSINESS DOUBLE FACED PROJECTING SIGN; COPY READING VERIZON.
mechanical work during interior demolition