994 1 AVENUE, Manhattan, NY, 10022 · New York City · 199 total events
Remove plumbing fixtures and associated piping. Install new plumbing fixtures and associated CW/sanitary piping on the 17-20th Floors as per plans (Salesforce Restrooms Refresh.) No change to use, egress or occupancy.
Remove (6) head, install (6) new heads on 17; Remove (7) head, install (7) new heads on 18; Remove (7) head, install (7) new heads on 19; Remove (6) head, install (6) new heads on 20th Flr and associated piping as per plans (Salesforce Restroom Refresh.)
Alt CO filed to increase population and establish PA on the 36th fl.
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR PANDORA
Modifications to the existing HVAC System: Installation of new ductwork, diffusers and grilles on the 17-20th Floors as per plans (Salesforce Restroom Refresh.) No change to use, egress or occupancy.
Modifications to the existing HVAC System: Installation of new 40-ton AC Unit, ductwork, controls on the 28th Floor as per plans (Dechert LLP - AC Unit.) No change to use, egress or occupancy.
Minor demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 17-20th Floors as per plans (Salesforce Tower NY Restrooms.) No change to use, egress or occupancy.
Installation of temporary plywood enclosure and platform during construction operation as per plans (Hines Cubes Amenity Project.) No change to use, egress or occupancy.
Modifications to the existing HVAC System: Installation of new Water-Air Heat Pump, ductwork, diffusers and grilles on the 25th Floor as per plans (Salesforce NY Tower.) No change to use, egress or occupancy.
Modifications to the existing HVAC System: HVAC demolition, cut back & demolish duck work on the 25th Floor as per plans (Salesforce NY Tower.) No change to use, egress or occupancy.
Install (5) BFPs (secondary), (3) CM, (2) DW, (1) IM, (4) FDs, (1) WC, (1) Lav, (1) HWH, (2) sinks, (1) water dispenser, (1) circulation pump and associated CW/drainage piping on 25th Floor; Install sanitary piping on 24th Floor (Salesforce Tower NY F25.)
Modifications to the existing Sprinkler System: Remove (44) temporary heads and Install (187) new sprinkler heads and associated piping on the 25th Floor as per plans (Salesforce Tower NY L25.) No change to use, egress or occupancy.
Minor demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 25th Floor as per plans (Salesforce Tower NY F25.) No change to use, egress or occupancy.
Remove (32) sprinkler heads, Install (33) new sprinkler heads, Relocate (1) sprinkler head and (1) FHC and associated SP/SD piping on the 3rd Floor; Relocate (2) sprinkler heads on the 4th Floor as per plans (Stifel - New Offices & Conference Rooms.)
Remove (32) sprinkler heads, Install (33) new sprinkler heads, Relocate (1) sprinkler head and (1) FHC and associated SP/SD piping on the 3rd Floor; Relocate (2) sprinkler heads on the 4th Floor as per plans (Stifel - New Offices & Conference Rooms.)
Hereby filing modification to existing sprinkler system per plans filed herewith.
Hereby filing modifications to existing mechanical system and related duct & piping per plans filed herewith.
Hereby filing concrete equipment pad modifications and minor wall alterations in support of new mechanical equipment and rigging paths on floor 7, and 9 thru 11
Minor interior demo: remove and discard walls, ceilings, flooring. Install new drywall partitions, office front system, millwork, suspended ceiling, flooring and finishes on the 3-4th Floors as per plans (Stifel - Offices & Conference Rooms.)
Modifications to the existing HVAC System: Installation of new ductwork, insulation, air outlets, relocate FPB and controls on the 3-4th Floors as per plans (Stifel - New Offices & Conference Rooms.) No change to use, egress or occupancy.
Remove (1) water dispenser and install (1) Sink, (1) HWH, (1) FD, (1) Sewage Ejection Pump on the 3rd Floor; Install (1) sink, (1) HWH, (1) FD and associated CW/sanitary piping on the 4th Floor as per plans (Stifel - New Offices & Conference Rooms.)
INSTALLATION OF TEMPORARY GUARDRAIL SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Interior removals and modifications to ductwork, associated piping on the 36th & 37th Floors as per plans (Standard Chartered Bank.) No change to use, egress or occupancy.
Furnish and Install New Mechanical System throughout floor - new ductwork, piping, FPBs, air outlets and AC Units on the 36th Floor as per plans (Standard Chartered Bank - Phase 2.) No change to use, egress or occupancy.
Minor interior demo of interior partitions, doors, suspended ceilings, office front system, flooring and finishes on the 36th & 37th Floors as per plans (SCB-36hth & 37th Floor Interior early demo). No change to use, egress, or occupancy.
New mechanical system throughout 37th Floor, inclusive of new ductwork, piping, air outlets, AC units, as per plans (Standard Chartered Bank.) No change to use, egress or occupancy.
Minor interior demo. Installation of new interior partitions, doors, suspended ceilings, raised flooring and finishes on the 36th Floor as per plans (Standard Chartered Bank - Phase 2.) No change to use, egress or occupancy.
Interior fit-out, construction of the 37th Floor, new partitions, doors, suspended ceilings, office front system, flooring and finishes on as per plans (SCB-37th Floor Interior Renovation). No change to use, egress, or occupancy.
Structural Modifications: Installation of structural steel beams and supports on the 1st Floor as per plans (Cubes Plaza Amenity.) No change to use, egress or occupancy.
Modifications to the existing Sprinkler System: Remove (43) sprinkler heads and Install (54) new sprinkler heads on the 1st Floor as per plans (Cubes Plaza Amenity.) No change to use, egress or occupancy.
Install new plumbing fixtures: (3) HWH, (4) sinks, (7) FDs, (3) WCs, (3) Lavatories, (1) IM, (1) DW and associated CW/sanitary piping on the 1st Floor as per plans (Cubes Plaza Amenity.) No change to use, egress or occupancy.
Minor interior demolition. Installation of new interior partitions, suspended ceilings, flooring, finishes and white box space on the 1st Floor as per plans (Cubes Plaza Amenity.) No change to use, egress or occupancy.
Modifications to the existing HVAC System: Installation of chilled water piping and outside air ductwork on the 1st Floor as per plans (Cubes Plaza Amenity.) No change to use, egress or occupancy.
Modifications to the existing HVAC System: Extend flue exhaust pipes on the 3rd Floor/ Annex Roof as per plans (Sub-cellar Generator Exhaust Remediation.) No change to use, egress or occupancy.
Structural modifications: new extension of generator exhaust risers and opening in new slab and existing roof slab for exhaust pipes on the 3rd Floor/ Annex Bulkhead Rood. No change to use, egress or occupancy.
Alterations to the existing exterior wall to relocate generator exhaust flue and repair and replace existing exterior wall on the 1st & 2nd Floor Roofs as per plans (1095 Annex/ Generator Exhaust.) No change to use, egress or occupancy.
Minor demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the Cellar & 1st Floor as per plans (Pandora Evoke 2.0.) No change to use, egress or occupancy.
Modifications to the existing HVAC System on the Cellar & 1st Floors as per plans (Pandora - Evoke 2.0.) No change to use, egress or occupancy.
Replace (8) water closets, (2) urinals, (10) lavatories and Install New: (2) lavs, (2) WCs, (3) HWH, (9) FD, (7) Ice Makers, (2) DW, (2) DF, (12) Sinks, (2) Showers and CW/sanitary piping on the 36th Flr as per plans. (Standard Chartered Bank - Phase 2.)
Install (392) new sprinkler heads and associated Sprinkler Piping on the 36th Floor as per plans (Standard Chartered Bank - Phase 2) No change to use, egress or occupancy.
Remove and replace existing horizontal split case fire pump on the Sub-Cellar Level as per plans. No change to use, egress or occupancy.
Install (1) Drinking fountain and relocate (1) existing sink and associated CW/sanitary piping on the cellar level as per plans (Pandora.) No change to use, egress or occupancy.
Modifications to the existing Sprinkler System: Remove (17) existing heads, Relocate (2) heads and install (16) new heads on the 1st Floor as per plans (Pandora - Evoke 2.0.) No change to use, egress or occupancy.
Filing for Plumbing modifications as per the plans filed herewith. No change in use, egress or occupancy.
Modifications to the existing Sprinkler System: Remove (14) heads and Install (16) new heads and piping on 3rd Floor, Remove (16) heads and Install (19) new heads and associated piping on the 4th Floor as per plans (Stifel Pantry Project.)
Modifications to the existing Sprinkler System: Remove (10) existing sprinkler heads and install (10) new sprinkler heads and associated piping on the 15th Floor as per plans (US Bank). No change in use, egress, or occupancy.
Removal of plumbing fixtures. Install new fixtures: (2) HWH, (1) FD, (1) sink, (1) Lavatory, (1) water closet and associated CW/sanitary piping on the 15th floor as per plans (US Bank Bryant Park CRE Expansion.) No change in use, egress or occupancy.
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 26-27, 29-31st Floors as per plans (Dechert LLP - Demo and Buildout.) No change to use, egress or occupancy.