881 1 AVENUE, Manhattan, NY, 10022 · New York City · 25 total events
INTERIOR RENOVATION OF ELEVATOR LOBBIES AS PER PLAN. FLOORS, WALLS, DOORS AND CEILING . NO CHANGE IN OCCUPANCY, USE AND EGRESS.
INSTALLATION OF NEW SIDEWALK SHED AT 141 EAST 25 STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Baruch College. IT Bldg, Cooling Tower Access - Construction of steel maintenance platforms to service existing cooling tower units CT-4 and CT-5. Removal and replacement of metal bar grating as per the plans filed.
APPLICATION FILED TO MODIFY EXISTING MECHANICAL DUCT WORK AND REPLACE AC UNITS WITH LIGHTING AS PER PLAN. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
GENERAL CONSTRUCTION WORK FOR REPLACEMENT OF HOT AND COLD GLYCOL PIPING
MODIFICATIONS TO MECHANICAL SYSTEMS
SPRINKLER MODIFICATION UPDATED ELEVATOR PIT SUMP PUMP DESIGN AS PER PLANS
PROVIDE STRUCTURAL STEEL FRAMING SYSTEM FOR A NEW CANOPY IN AN EXISTING LOBBY.
MECHANICAL WORK INCLUDES HYDRONIC HEATING UNITS & AIR-CURTAIN INSTALLATION IN THE NEW LOBBY CANOPY. HOT WATER SUPPLY IS SOURCED FROM THE EXISTING BOILER INSTALLATION IN THE BASEMENT VIA NEW PIPING ETC.
MECHANICAL MODIFICATIONS AND REPLACEMENT OF VIBRATION ISOLATOR TO 6 UNITS AT THE UPPER ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
ROOF REPLACEMENT AND GUARD RAIL INSTALLATION AT UPPER ROOF (PENTHOUSE ROOF & 9TH FLOOR) AND RELATED CONSTRUCTION WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 152 EAST 26TH STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
PLUMBING MODIFICATIONS AND REPLACEMENT OF ROOF DRAINS (12 UNITS) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
SPRINKLER MODIFICATION UPDATED ELEVATOR PIT SUMP PUMP DESIGN AS PER PLANS
PROVIDE NEW SPRINKLER HEADS IN NEW CANOPY. PROVIDE SPRINKLER SUPPLY PIPING FROM THE EXISTING BUILDING SPRINKLER SYSTEM.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
mechanical modification including the removal/replacement of chillers and associated ductwork/piping and associated system components.
Installation of new chiller supports on cellar and modification of 1st floor framing for removal/installation of chillers
replacement of hot and cold glycol piping at Baruch college
ITB Cooling Towers 4 & 5 replacements. No change in use egress or occupancy.
INSTALLATION OF PIPE SCAFFOLDING
AT&T - Replacement of existing antennas and RRH units on the roof. Installation of new RRH units on the roof and retrofit of existing cabinet on the existing equipment platform on the roof. All work in compliance with TPPN 5/98. No change to occupancy, use or egress.
INSTALLATION OF TEMPORARY SUPPORTED SCAFFOLDING WITH DANCE FLOOR INSIDE LIBRARY FOR USE DURING SKYLIGHT REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.