880 5 AVENUE, Manhattan, NY, 10021 · New York City · 77 total events
Mechanical to be preformed in existing unit #3F/3G on 3rd fl. Initial general construction & subsequent plumbing application to be filed. All in accordance with submit plans. All in accordance with submitted plans. No changes to use, egress or occupancy.
Exterior and combination as per TPPN 3/1997 proposed in unit #3F/3G on 3rd fl. Initial general construction, subsequent plumbing and mechanical application to be filed. All in accordance with submitted plans. No changes to use, egress or occupancy
Plumbing and combination as per TPPN 3/1997 proposed in unit #3F/3G on 3rd fl. Initial general construction, subsequent general/exterior and mechanical application to be filed. All in accordance with submit plans. No changes to use, egress or occupancy
Interior renovation and combination as per TPPN 3/1997 proposed in unit #3F/3G on 3rd fl. Subsequent plumbing, general construction/exterior & mechanical application to be filed. All in accordance w/ submitted plans. No changes to use, egress or occupancy
INSTALLATION OF TEMPORARY SHANTY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FACADE REPAIRS INCLUDING PARAPET AND TERRACE PARAPET RECONSTRUCTION, SPANDREL REPAIRS, BRICK REPLACEMENT, POINTING, CORNER REPLACEMENT, AND SILL REPLACEMENT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Interior renovations of dental office to include partitions and finishes along with mechanical work as per plans filed herewith. No change to use, egress or occupancy.
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS, ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS, ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of suspended scaffold for facade work or inspection.
Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy.
remove existing steam piping to existing radiators
installation of new ductless HVAC equipment
General construction work is proposed for unit #10H on the 10th floor. A subsequent plumbing application will be filed. All work is in accordance with the submitted plans. There are no changes to use, egress, or occupancy under this application.
PLUMBING RENOVATIONS PERFORMED ON UNIT 19B, NO CHANGE IN USE, EGRESS OR OCCUPANCY
Plumbing work is proposed for unit #10H on the 10th floor. A subsequent plumbing application will be filed. All work is in accordance with the submitted plans. There are no changes to use, egress, or occupancy under this application.
renovations in apt 19B only as per plans, no change in use, egress or occupancy.
PROPOSED HVAC DESIGN FOR APT#14B ON THE 14TH FLOOR UTILIZING MINI SPLIT CONDENSER SYSTEM AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
REMOVE AND INSTALL PLUMBING FIXTURES AS PER PLANS SUBMITTED HEREWITH.
INTERIOR RENOVATION TO APARTMENT #14B ON THE 14TH FLOOR. REMOVE AND CONSTRUCT PARTITIONS AND FINISHES AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
replacement of plumbing fixtures. No change of use, egress, or occupancy under this application
Selective demolition of non-structural partitions and finishes, new non-structural partitions, new flooring finishes, and new millwork. No change of use, egress, or occupancy under this application.
Judgment: NO
Installation of outriggers for facade repair & inspection.
plumbing for apt 5f alt-2 Interior fit out
Interior fit out Alt-2 on 5th floor Apartment 5F
THIS APPLICATION IS FOR THE ALTERATION OF AN EXISTING STAFF ROOM(AKA MAIDS ROOM) AT THE SECOND FLOOR, INCLUDING REPLACING A WINDOW, ADDING A THROUGH-WALL PTAC UNIT AND CABINETS.
Replacement of a window sill & addition of a through-wall PTAC unit and cabinets as per plans submitted herewith.
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 11C ON THE 11TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
INTERIOR RENOVATION OF APARTMENT 11C ON THE 11TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
APPLICATION FILED TO RENOVATE 3RD FLOOR APARTMENT; - minor plumbing work for apt 3L only for kitchen and bathrooms. no change in use, egress, or occupancy.
interior renovations of apt 3L only. no change in use egress or occupancy.
PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION IN CONJUNCTION WITH APT#6A RENOVATION. INSTALL NEW LIGHTING. PL WORK FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY, EGRESS OR FIRE PROTECTION.
FILING FOR THE INTERIOR RENOVATIONFOR APARTMENT 10F, INCLUDING REMOVAL AND INSTALLATION OD PARTITIONS, DOORS, CEILINGS, FLOORS, AND FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS PROPOSED.
MIsc. renovations in apt 2k, second floor. Work to include new finishes in kitchen and bathroom. Plumbing to be filed separately. no change in use, egress , nor occupancy.
New alt2 application for general construction work to be performed in existing unit 16A on the 15th fl. Subsequent plumbing application be filed. All in accordance with submitted plans. No changes to use, egress, or occupancy under this application.
RENOVATION OF APARTMENT #6C; DEMOLITION OF INTERIOR NON-LOADBEARING PARTITIONS; CONSTRUCTION OF NEW PARTITIONS; NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Install 1 new thru-wall AC unit and associated General Construction work, as per plans.
New alt2 application for plumbing work to be performed in existing unit 16A on the 15th fl. All in accordance with submitted plans. No change to use, egress or occupancy under this application.
REPLACE EXISTING PLUMBING FIXTURES ONLY.
PERFORM PLUMBING MODIFICATION WORK IN CONJUNCTION WITH APT#6A RENOVATION. REMOVE, INSTALL & REPLACE FIXTURES. GENERAL CONSTRUCTION WORK FILED UNDER APPLICATION #M00760406. NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION.
Plumbing work associated with apt 12E only
renovation work on apt 12 E only. No change in use, egress or occupancy.
plumbing work in conjunction with interior renovation of apt2k. construction filed under job# M00592876. no change in use, egress, nor occupancy.
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Relocating of Existing plumbing fixtures in Kitchen and Master Bathroom. new sink added to master bathroom, and new washing machine added to laundry. replace toilet and lavatory in bathroom 2 on existing roughing No Change in Use Egress or Occupancy.
Mechanical Installation in apartment 3D. No Change in Use, Egress or Occupancy.
Renovation of existing apartment including interior partitions, floors and ceilings. New Kitchen Cabinets. Plumbing and Mechanical filed separately. No Change in Use, Egress or Occupancy.