870 1 AVENUE, Manhattan, NY, 10017 · New York City · 32 total events
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
ConEd Exterior Promenade & Roof repairs at 4th & 19th Fl per plans: Repairs, Removal and replacement of the existing roof membrane, flashing, door, roof drains, masonry, concrete, Stone spall & dutchman. Install new pavers, railings & stairs.
PROPOSE TO REMOVE EXISTING KITCHEN EQUIPMENT,SUSPENDED CEILING, NON-LOAD BEARING PARTITIONS AND FINISHES AS SHOWN HEREIN IN THE CONSTRUCTION DOCUMENTS. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
Infill of slab openings from various ductwork removals
Removal of various ductwork, exhaust fans from floors & roof as noted.
ConEd Exterior Facade & Cornice repairs at 4th floor (Top of 3rd Floor Southwest Roof) as per plans filed including: Limestone cleaning, joint re-pointing and dentil replacement.
alteration to existing mechanical system and ductwork
Modifications to existing sprinkler system on second floor
installation of new partitions to create two new private offices & minor repairs to existing partitions within the scope of work.
Voluntary installation of new EV Charge Station. No change in use egress or occupancy under this application
Modification to sprinkler system on 16th floor
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Facade Restoration
Facade Restoration
installation of new partitions to create a new private office.
Interior alterations to ductwork & mechanical system for 16th floor
Facade Restoration
FILING FOR STRUCTURAL WORK ASSOCIATED WITH 2nd FLOOR PA4 MECHANICAL ROOM AS PER PLANS SUBMITTED HEREWITH.
ConEd Exterior Roof repairs at 20th & 21st Fl per plans: Repairs, Removal and replacement of the existing roof membrane, flashing, scupper, leader, gutter, masonry, concrete, stone spall & dutchman. Install new pavers & plant tray.
PIPE SCAFFOLD TO BE INSTALLED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Proposed installation of closets to house Fire Alarm equipment associated with LL 191
VARIOUS ALTERATIONS TO PLUMBING/SPRINKLER SYSTEMS ON 19TH FLOOR
VARIOUS ALTERATIONS TO PLUMBING/SPRINKLER SYSTEMS ON 19TH FLOOR
Modification to existing sprinkler system
FILING FOR MECHANICAL UPGRADE AHU OF 2ND FLOOR 'PA4 MECHANICAL ROOM AS PER PLANS SUBMITTED HEREWITH.
Replace existing wall mounted AC units.
SUSPENDED SCAFFOLDING AS SHOWN ON PLANS
FILING FOR MINOR SP MODIFICATION AS PER PLANS SUBMITTED HEREWITH.
Modifications to existing mechanical system.
INSTALLATION OF SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of sanitary piping to existing riser on 15th floor. Hot/Cold/Venting to existing riser on Floor 16 to accommodate appliances to existing pantry