845 THIRD AVENUE GROUND FLOOR, Manhattan, NY 10022 · New York City · 52 total events
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Installation of temporary pipe scaffold as hoist runback/landing structure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
INSTALLATION OF TEMPORARY ROOF PROTECTION, OHP, & WINDOW PROTECTION OVER ADJACENT PROPERTIES AS PER PLANS. TEMPORARY PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Plumbing work as shown on the plans.
Mechanical removal work as shown.
Interior non-structural demolition to the 4th floor as shown.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Interior non-structural demolition as shown on the plans.
Mechanical work as shown on the plans.
Modify existing sprinkler system as per plans
Apt 604 RES CO-WORK 02 — Possession
Filing for interior renovation of 14th floor Vector Media office as per plans submitted herewith.
Apt unknown — Possession
Filing to repair, patch, and replace facade surfaces as per plans. No change in use, egress, or occupancy under this application.
1.INTERIOR RENOVATION AT 1ST FLOOR RETAIL STORE 2.INSTALLATION OF HVAC, TOILET EXHAUSTSELECTRIC HOT WATER HEATERS.
1.INTERIOR RENOVATION AT 1ST FLOOR RETAIL STORE 2.INSTALLATION OF HVAC, TOILET EXHAUSTSELECTRIC HOT WATER HEATERS.
FILING FOR MINOR SPRINKLER WORK ASSOCIATED WITH INTERIOR RENOVATION OF 14TH FLOOR VECTOR MEDIA AS PER PLANS SUBMITTED HEREWITH.
FILING FOR INTERIOR RENOVATION OF 14TH FLOOR VECTOR MEDIA OFFICE AS PER PLANS SUBMITTED HEREWITH.
FILING FOR MECHANICAL WORK ASSOCIATED WITH 14TH FLOOR VECTOR MEDIA AS PER PLANS SUBMITTED HEREWITH.
FILING FOR MINOR INTERIOR RENOVATION OF 7TH FLOOR HUMANA OFFICE AS PER PLANS SUBMITTED HEREWITH.
Sprinkler work as shown on plans.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Filing for interior renovation of 9th floor office for South African Consulate as per plans submitted herewith.
FILING FOR MINOR INTERIOR RENOVATION OF 2ND AND 3RD FLOOR CONFERENCE BOARD OFFICE AS PER PLANS SUBMITTED HEREWITH.
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Structural work for the replacement of Storefronts and construction of interior partitions as shown on plans.
Mechanical work as shown on plans
FILING FOR SPRINKLER WORK ASSOCIATED WITH INTERIOR RENOVATION OF 17TH FLOOR OFFICE SPACE FOR HEROLD & LANTERN AS PER PLANS SUBMITTED HEREWITH.
BOROUGH COMMISSIONER HAS ISSUED A STOP WORK ORDER FOR JOB # 123812525 DUE TO SUPERINTENDENT'S WITHDRAWAL.
FILING FOR INTERIOR RENOVATION OF 17TH FLOOR OFFICE SPACE FOR HEROLD & LANTERN AS PER PLANS SUBMITTED HEREWITH.
Replacement of Storefronts and construction of interior partitions as shown on plans.
ERECT ACCESSORY BUSINESS WALL SIGN FOR FEDEX, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FILING FOR INTERIOR RENOVATION OF 2ND FLOOR FOR PREBUILT OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
FILING FOR MH WORK ASSOCIATED WITH 2ND FLOOR PREBUILT OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH.
Plumbing work as shown on plans.
INSTALLATION OF PLYWOOD FENCE ENCLOSURE AS PER DRAWINGS. PLYWOOD FENCE ENCLOSURE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
FILING FOR PLUMBING AND SPRINKLER WORK ASSOCIATED WITH INTERIOR RENOVATION OF THE 2ND FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
FILING FOR PLUMBING AND SPRINKLER WORK ASSOCIATED WITH 3rd FLOOR CONFERENCE BOARD RENOVATION AS PER PLANS SUBMITTED HEREWITH.
FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR RENOVATION OF 3RD FLOOR OFFICE SPACE FOR CONFERENCE BOARD AS PER PLANS SUBMITTED HEREWITH.
FILING FOR INTERIOR RENOVATION 3RD FLOOR OFFICE FORCONFERENCE BOARD AS PER PLANS SUBMITTED HEREWITH.
FILING FOR PLUMBING AND SPRINKLER WORK ASSOCIATED WITH 3rd FLOOR CONFERENCE BOARD RENOVATION AS PER PLANS SUBMITTED HEREWITH.
FILING FOR PLUMBING AND SPRINKLER WORK ASSOCIATED WITH INTERIOR RENOVATION OF THE 2ND FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
FILING FOR PLUMBING AND MECHANICAL WORK ASSOCIATED WITH THE RENOVATION OF 7TH FLOOR HUMANA OFFICE AS PER PLANS SUBMITTED HEREWITH.
FILING FOR PLUMBING AND MECHANICAL WORK ASSOCIATED WITH THE RENOVATION OF 7TH FLOOR HUMANA OFFICE AS PER PLANS SUBMITTED HEREWITH.
FILING FOR HVAC UPGRADE FOR 7TH FLOOR HUMANA OFFICE AS PER PLANS SUBMITTED HEREWITH.
FILING FOR MECHANICAL WORK ASSOCIATED WITH 11TH FLOOR PRE-BUILT OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
No description available
FILING FOR PLUMBING AND SPRINKLER WORK ASSOCIATED WITH 11TH FLOOR PREBUILT OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH.