APPLICATION FILE TO INTERIOR RENOVATION EXIST. STORE AS REMOVE & INSTALL PARTITION, CEILING, FLOOR TILES AND STORE FRONT WORK AT 1st FLOOR FOR HAAGEN-DAZS ICE CREAM STORE AS PER PLAN. PLUMBING WORK UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR
Propose mechanical work as per drawings filed herewith. No change in use, egress or occupancy.
Propose plumbing work and modification of existing sprinkler system. No change in use, egress or occupancy.
Propose plumbing work and modification of existing sprinkler system. No change in use, egress or occupancy.
Filing subsequent structural application for work associated with infill of existing stair opening between cellar and ground floor.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 10 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B.
Propose to perform mechanical work. No change in use, egress or occupancy.
Propose to perform interior renovations. No change in use, egress or occupancy.
Filing subsequent application for installation of plumbing fixtures and electric HWH in restroom on 1st floor.
Propose to perform plumbing and sprinkler work. No change in use, egress or occupancy.
Propose to perform plumbing and sprinkler work. No change in use, egress or occupancy.
Propose to perform interior renovations. No change in use, egress or occupancy.
Propose to perform mechanical work. No change in use, egress or occupancy.
Propose to perform plumbing and sprinkler work. No change in use, egress or occupancy.
Filing for installation of 117 new sprinkler heads on the 12th floor, commercial space, as per plans submitted.
Call
Mobile App
Call
INTERIOR RENOVATIONS OF THE 11TH FLOOR OFFICE SPACE, CONSISTING OF PARTITIONS, LIGHTING, AND FINISHES, AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
MECHANICAL WORK ASSOCIATED WITH THE INTERIOR RENOVATIONS OF THE 11TH FLOOR OFFICE SPACE, CONSISTING OF PARTITIONS, LIGHTING, AND FINISHES, AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Renovation of existing partial commercial floor with new plumbing fixtures, as per drawings herein. Approx. 28,000 SF. No change to use, egress, or occupancy.
Interior renovation of existing office space on 11th Floor. Modification of existing sprinkler system. No change in use, egress, or occupancy.
Propose to install HVAC units. No change to use, egress or occupancy.
Propose to file for plumbing and sprinkler work. No change to use, egress or occupancy.
Propose to file for plumbing and sprinkler work. No change to use, egress or occupancy.
Propose to perform interior renovations. No change to use, egress or occupancy.
Filing for the removal and replacement of 11 sprinkler heads and installation of 1 new head as per plans submitted, in association with DOB NOW application # M08006908-I1
GDK RESTAURANT RENOVATION INCLUDES INSTALLATION OF COMMERCIAL KITCHEN HOOD, EXHAUST FAN, AND DUCTWORK.
Filing application for installation of air conditioning units as per plans submitted, in association with DOB NOW application # M08006908-I1
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF PLUMBING FIXTURES AND SPRINKLER HEADS. MODIFICATION OF SPRINKLER HEADS WITH PIPES.
INSTALLATION OF PLUMBING FIXTURES AND SPRINKLER HEADS. MODIFICATION OF SPRINKLER HEADS WITH PIPES.
Filing for the interior renovation of office space on the 12th floor; includes installation of interior non-load bearing partitions and finish work. Mechanical, plumbing and sprinklers to be filed subsequently. No change to use, egress or occupancy.
installation of plumbing fixtures and new water meter as per plans submitted.
Installation of mechanical air handling system and associated duct work as per plans submitted.
MINOR PLUMBING WORK TO COMMERCIAL AREA INCLUDING INSTALLATION OF NEW SANITARY PIPES AND PIPE VENTS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION OF A GDK RESTAURANT INCLUDING INSTALLATION OF PARTITIONS, FLOORING, CEILING FINISH, AND REPLACEMENT OF STOREFRONT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY CONSTRUCTION WOOD FENCE PER PLAN SUBMITTED DURING ALTERATION WORK. THE WORK SHALL COMPLY WITH THE 2014 BUILDING CODE CHAPTER 33.
Filing for interior renovation of 12th floor - includes installation of interior non-load bearing partitions and finish work. Plumbing work to be filed subsequently in DOB NOW. No change to use, egress or occupancy.
PROPOSE TO PERFORM PLUMBING AND SPRINKLER WORK RENOVATIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
PROPOSE TO PERFORM PLUMBING AND SPRINKLER WORK RENOVATIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TWO NEW GAS METER BARS FOR 1000 CFH FUTURE GAS METERS AND TWO LOCKED VALVES FOR TWO ADDITIONAL FUTURE GAS METERS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Propose to remove interior partitions. No change to use, egress or occupancy.
Propose to perform interior renovations. No change to use, egress or occupancy.
PROPOSE TO PERFORM MECHANICAL WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Installation of sprinkler heads as per plans filed herewith.
Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy.
POST APPROVED AMMENDMENT FILED FOR REVISIONS TO PLANS, SUBMISSION OF STANDPIPE AND SPRINKLER RISER DIAGRAMS, SUPERSEDE PAGE SP-126.01 TO SP-126.02. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
rel/repl and adjust sprinkler heads. Also, please install new sprinkler heads.