802 8 AVENUE, Manhattan, NY, 10019 · New York City · 31 total events
Build out of office space at the 6th floor. No change to use, egress or occupancy.
PLUMBING MODIFICATIONS FOR 3RD FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
SPRINKLER MODIFICATIONS FOR 3RD FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
INTERIOR RENOVATION OF 3RD FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 11TH FL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filing plans for a construction fence, filed in conjunction with storefront application #M01110861-S1
Herewith file plans for the storefront repair, interior general construction filed under Doc I1. No change to use, egress or occupancy.
Interior renovation of existing 1st floor commercial space: replace millwork & finishes and replace light fixtures. No change to use, egress, or occupancy.
APPLICATION FILED FOR SPRINKLER MODIFICATIONS/ADDITIONS ON THE 11TH FL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 11TH FL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 11TH FL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 11TH FL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
APPLICATION FILED FOR PLUMBING REMOVAL/MODIFICATIONS ON THE 11TH FL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Interior partitions and finishes as per plans filed herewith. No change to use, egress or occupancy.
INSTALLATION OF ROOF DECK WITH PAVERS ON PEDESTAL AS SHOWN ON DRAWINGS.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 2ND AND 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Facade repair including miscellaneous brick repair, decorative stone repair, decorative sill replacement and masonry repairs as per plans filed. No change in use, egress or occupancy.
INTERIOR APPLICATION FILED FOR INTERIOR RENOVATION TO 9TH FLOOR AS SHOWN ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF (2) NEW AIR COOLED AC UNIT AND TIE IN WITH EXISTING DUCTWORK SYSTEMS. PROVIDE AUTOMATIC CONTROLS TO OPERATE IN AN ENERGY EFFCIENT MANNER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
SPRINKLER WORK AT 7TH FLOOR (PCC) AS INDICATED ON DRAWINGS.
Installation of Mechanical Units. No Change in Occupancy Use or Egress.
PLUMBING WORK AT 7TH FLOOR (PCC) AS INDICATED ON DRAWINGS.
Modification to Existing Sprinkler System. No Change in Occupancy, Use or Egress.
MECHANICAL WORK AT 7TH FLOOR (PCC) AS INDICATED ON DRAWINGS.
Modification to Existing Toilet Exhaust. No Change in Occupancy, Use or Egress.
Installation of New Plumbing Fixtures & Replacement of Plumbing Fixtures. No Change in Occupancy, Use or Egress.
Replacement of Mechanical Units & Ductwork Modification. No Change in Occupancy, Use or Egress.
Install Three (3) New Lavatories, One (1) New Toilet & One (1) New Urinal, and Relocate Six (6) Lavatories, Two (2) Urinals, Seven (7) WC's & Two (2) HW Heaters (Non-gas) on the 7 Floor. No Change in Occupancy, Use or Egress.
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.