INSTALL EXTERIOR NON-ILLUMINATED BLADE SIGN (MOMATH)
INSTALL EXTERIOR NON-ILLUMINATED BLADE SIGN (MOMATH)
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.THE PIPE SCAFFOLD IN THE COURTYARD AT THE EAST WALL FROM THE 2ND FLOOR LOWER ROOF BEAM SYSTEM/OVERHEAD PROTECTION PAST THE MAIN ROOF PARAPET WALL.
Construction work to create protected openings to adjacent building (635 Avenue of the Americas) on the 8th floor per CCD1 # 73709
Architectural modifications to windows and lobby entry door at 1st floor facade along West 20th Street and minor interior signage and tile work at Sixth Street lobby as indicated on drawings.
Structural work to create protected openings to adjacent building (635 Avenue of the Americas on part of the 8th floor as indicated on drawings.
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Structural framing for new stair, dunnage and miscellaneous framing as per plans filed herewith.
Modifications to plumbing and sprinkler systems as per plans filed herewith.
Modifications to plumbing and sprinkler systems as per plans filed herewith.
Interior renovations as per plans filed herewith. No change in use, occupancy or egress.
Modification to Mechanical systems as per plans filed herewith.
change of use to a museum. install partitions ceilings and doors. modify existing storefronts.
Interior mechanical demolition on the 7th and 8th floor as indicated on drawings
Installation of new plumbing fixtures and related piping
INSTALLATION OF TEMPORARY SIDEWALK SHED/PLYWOOD FENCE AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED AT THE FRONT OF THE BUILDING AT 6 AVENUE ELEVATION.
propose the removal and installation of new steel framing and concrete for new ornamental stair
Installation of beams and slab, structural reinforcement.
Construct interior partitions, ceilings and doors
Remove sprinkler heads and replace with temp loop
Propose to install mechanical ductwork, ac units and vent piping
Remove existing plumbing fixtures; related piping and cap lines on main source
REMOVAL OF EXISTING TERMINAL BOXES, CABINET UNIT HEATERS, CONTROLS, AND ASSOCIATED PIPING AND DUCTWORK BACK TO EXISTING MAINS AND BASE BUILDING RISERS.
Interior removal/ demo of partitions, ceilings and doors
Erect, maintain and dismantle construction fence, as per plans filed herewith, for sidewalk repair work. No change to use, egress or occupancy.
Filing for Mechanical modifications to include installation of HVAC unit as per plans filed herewith. No Change in use, egress, or occupancy.
Interior sprinkler demolition and installation of temporary sprinkler loop on the 7th and 8th floor as indicated on drawings
Interior demolition of non load bearing partitions and related work on the 7th and 8th floor as indicated on drawings.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
REMOVAL AND REPLACEMENT OF THE SIDEWALK TOPPING SLAB,STRUCTURAL SLAB&FRAMING AT THE EXTENT INDICATED ON PLAN INCLUDING CURB REPLACEMENT,SEALANT JOINTS&REINFORCEMENT OF EXISTING STRUCTURE TO REMAIN AS REQUIRED. SIDEWALK REPAIRS AT WEST 20TH ST & 6TH AVE.
Lintel replacement as needed.
CYCLE 9 FISP REPAIR AND MAINTENANCE PROGRAM AND REPAIRS.
REMOVAL AND REPLACEMENT OF THE SIDEWALK TOPPING SLAB,STRUCTURAL SLAB&FRAMING AT THE EXTENT INDICATED ON PLAN INCLUDING CURB REPLACEMENT,SEALANT JOINTS&REINFORCEMENT OF EXISTING STRUCTURE TO REMAIN AS REQUIRED. SIDEWALK REPAIRS AT WEST 20TH ST & 6TH AVE.
Infor - Architectural work on the 3rd floor as indicated on drawings
Infor - Plumbing work on the 3rd floor as indicated on drawings
Infor - Mechanical work on the 3rd floor as indicated on drawings
Construction work on the 8th floor terrace as indicated on drawings.
Structural work on the 8th floor terrace as indicated on drawings
Mechanical changes as indicated on plans; including the installation and removal of ductwork, dampers, diffusers, grilles, door louvers and vavs.
Bathrooms modifications as indicated on plans. No change in use, egress or occupancy.
Sprinkler modifications taking place on the 6th floor as per plans filed herewith. No change in use, egress or occupancy.
Sprinkler Head changes as indicated on plans.
Plumbing modifications taking place on the 6th floor as per plans filed herewith. No change in use, egress or occupancy.
Mechanical modifications taking place from the 6th & 8th floors as per plans filed herewith. No change in use, egress or occupancy,
General construction modifications taking place on the 6th floor as per plans filed herewith. No change in use, egress or occupancy
Sprinkler work on the 1st floor (lobby) as indicated on drawings
Plumbing Fixture changes as indicated on plans.
Removal and installation of interior non-baring partitions to create a new storage room and a mother room. The scope of work will include upgrading finishes and furniture no change to use or egress under this application.
Plumbing work on the 8th floor terrace as indicated on drawings
Construction work on the 1st floor (lobby) as indicated on drawings.