762 1 AVENUE, Manhattan, NY, 10017 · New York City · 13 total events
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
PLUMBING MODIFICATIONS FOR SUITE 1301 AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH DOB NOW GC APPLICATION M00492911-I1. NO CHANGE IN EGRESS, OCCUPANCY, OR USE.
INTERIOR RENOVATION OF SUITE 1301 AS SHOWN PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH DOB NOW JOB PLUMBING APPLICATION M00516815-I1 NO CHANGE TO EGRESS, OCCUPANCY OR USE.
STRUCTURAL WORK ON THE 1ST FLOOR AND CELLAR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
PLUMBING WORK ON THE 1ST FLOOR AND CELLAR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
SPRINKLER WORK ON THE 1ST FLOOR, MEZZANINE AND CELLAR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
GENERAL CONSTRUCTION ON THE 1ST FLOOR AND CELLAR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
MECHANICAL WORK ON THE CELLAR AND 1ST FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
FILING FOR PLUMBING AND SPRINKLER WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF 11TH FLOOR SUITE 1105 AS PER PLANS SUBMITTED HEREWITH.
FILING FOR MECHANICAL WORK ASSOCIATED WITH STE 1105 BUILDOUT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
FILING FOR PLUMBING AND SPRINKLER WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF 11TH FLOOR SUITE 1105 AS PER PLANS SUBMITTED HEREWITH.
Refurbish existing HVAC units, remove and replace existing, duct, grilles, louvers and intake/discharge ducts Install new spill air
Filing existing mechanical equipment and locations to obtain EUP card. No change in use, egress or occupancy.