750 1 AVENUE, Manhattan, NY, 10017 · New York City · 32 total events
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2021
No description available
No description available
No description available
No description available
No description available
No description available
No description available
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
OBSERVED A FAILED MISSING GLASS PANEL FROM PENTHOUSE 32 FL RAIL SYSTEM NORTH EAST CORNER OF BUILDING. REMEDY: OWNER TO IMMED RETAIN A NYS LIC PROFESSIONAL TO PERFORM A 100% HANDS ON INSPECTION OF ALL GLASS RAILING PANELS AND PROVIDE THE DEPT OF BUILDINGS FACADE UNIT WITH A REPORT AND COMPLETE REAIR PROPOSAL BY 1/16/21
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
No description available
No description available
No description available
No description available
No description available
No description available
No description available
No description available
No description available
No description available
No description available
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST