INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Modifications to existing sprinkler system in apt. #PH-36W, as per plans filed herewith. No change in use, egress or occupancy.
SPRINKLER MODIFICATIONS AT EXISTING 31ST FLOOR APT PH31A (PH31A_CO/PH33A_M) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PLUMBING MODIFICATIONS TO EXISTING 31ST FLOOR APT PH31A (PH31A_CO/PH33A_M) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MECHANICAL MODIFICATIONS TO INCLUDE DUCTWORK MODIFICATIONS AT EXISTING 31ST FLOOR APT PH31A (PH31A_CO/PH33A_M) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
DEMOLITION AND RENOVATION TO EXISTING 31ST FLOOR APT PH31A (PH31A_CO/PH33A_M) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Modification to mechanical systems in apt PH36W to include rerouting of ductwork, relocation of thermostats, revisions to air terminals, revision to kitchen and bathroom exhaust, revisions to fireplace makeup air ductwork, and new humidification system.
Interior build-out of existing apt #PH-36W, as per plans filed herewith. Work to include minor non-structural demolition, general construction and related finishes. No change in use, egress, or occupancy.
Renovation of existing private terrace on the 34th floor. Work to include removal and replacement of existing stone pavers on pedestal system as per plans filed herewith. No change in use, egress or occupation.
Modifications to existing plumbing system in Apt# PH-36W, as per plans filed herewith. No change in use, egress, or occupancy.
APPLICATION FILED TO INSTALL ONE DRINKING FOUNTAIN. FILED IN CONJUNCTION WITH NB #121190308.
INSTALL ILLUMINATED SIGN ON EXTERIOR WALL (FAENA)
INSTALLATION OF TEMPORARY INTERIOR WORK PLATFORM E AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
INSTALLATION OF HEAVY DUTY SIDEWALK SHED OVER HIGH-LINE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION/ PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE OVHP/PLYWOOD FENCE BY THE NEW STEEL STAIR LOCATION ON THE 18TH STREET ELEVATION. THE FENCE IS ON BOTH SIDES UNDER THE DECKING.
Facade repair, inspection, installation. POST APPROVAL AMENDMENT FILED HEREIN TO ADD ADDITIONAL SCAFFOLD DROPS
Modification of existing sprinkler system in Apt. #PH-36W. Work to include removal and relocation of sprinkler heads and piping, as per plans filed herewith. No change in use, egress or occupancy.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
Removal of interior non-structural wall partitions, doors, ceilings, and related finishes in apt #PH-36W, as per plans filed herewith. No change in use, egress, or occupancy.
APPLICATION FILED FOR STRUCTURAL WORK ASSOCIATED WITH CONSTRUCTION OF PLAZA. LANDSCAPE COMPONENTS OF THE PLAZA WERE FILED UNDER ALT 3 #123197593. FILED IN CONJUNCTION WITH NEW BUILDING #121190308. COSTS FOR THIS FILING INCLUDED IN NB COSTS.
Interior renovations to apartment 29B including the removal and installation on non-load bearing partitions and related finishes. No change in use, egress or occupancy.
Installation of a temporarily heavy-duty sidewalk and construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
Installation of a temporarily heavy-duty sidewalk and construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Facade repair, inspection, installation. POST APPROVAL AMENDMENT FILED HEREIN TO ADD ADDITIONAL SCAFFOLD DROPS
Facade repair, inspection, installation
INSTALLATION OF SIDEWALK SHED AND FENCE IN ACCORDANCE WITH NYC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF SIDEWALK SHED AND FENCE IN ACCORDANCE WITH NYC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Installation of four (4) gas boilers on the 26th floor of the East Tower as per plans filed herewith. No change in use, egress or occupancy under this application. Filed in conjunction with New Building # 121190308.
INSTALLATION OF TEMPORARY PIPE SCAFFOLDING EGRESS STAIR TOWER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIRS SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
INSTALLATION OF PIPE SCAFFOLDING ON EAST TOWER AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
INSTALLATION OF TEMPORARY FIXED BEAM MULTI-POINT SUSPENDED SCAFFOLD PLATFORM WITH NO COUNTERWEIGHT AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
INSTALLATION OF PIPE SCAFFOLDING AROUND EAST AND WEST TOWERS SETBACKS AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
INSTALLATION OF ALTERNATIVE COMMON PLATFORM TIE.
Installation of gas boilers as shown drawings filed herewith. No change in use, egress or occupancy.
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
INSTALLATION OF CONSTRUCTION FENCE IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
To erect pipe scaffold for construction of new building. No change in use, egress or occupancy.
INSTALLATION OF PIPE SCAFFOLD IN ACCORDANCE WITH NYCC 2014 CHAPTER 33.NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF HEAVY DUTY SIDEWALK BRIDGE FOR PEDESTRIAN SAFETY. SIDEWALK BRIDGE SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC CC. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY SCAFFOLD SYSTEM FOR WORKER ACCESS DURING CONSTRUCTION. SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS, OR OCCUPATION.
INSTALLATION OF SUPPORT SCAFFOLD IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS USE OR OCCUPANCY
INSTALLATION OF PIPE SCAFFOLD ON THE WEST TOWER ROOF/BULKHEAD IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF SUPPORT SCAFFOLD IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS USE OR OCCUPANCY.