67 PARK AVENUE, Manhattan, NY, 10016 · New York City · 30 total events
STRUCTURAL FRAMING WORK FOR THE BUILDING'S FUEL OIL TANK VAULT ROOM LOCATED UNDERGROUND OF SIDEWALK AT CELLAR LEVEL OF BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
REPLACEMENT 5,000 GALLON OIL TANK.
REPLACE BOILER AND OIL BURNER IN HEATING PLANT.
APARTMENT ONLY
INTERIOR RENOVATION OF AN EXISTING APARTMENT, INCLUDING PARTITION CHANGES AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
EXTERIOR REPAIRS CONSISTING OF STONE PATCH REPAIR, LINTEL REPLACEMENT, STUCCO REPAIRS AND STONE REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
FACADE RESTORATION, INSPECTIONS
FACADE RESTORATION, INSPECTIONS
IRA for vertical conduit Location inspection
Dish: Installation of new telecommunication antenna sectors, GPS, kickbacks&equipment cabinet on new platform on roof.Installation of conduits&service room connection as per plans.All work is in compliance w/ TPPN 5/98.No change in use,egress or occupancy
FACADE RESTORATION, INSPECTIONS
INSTALLATION OF MECHANICAL SYSTEM
INSTALL NEW CHIMNEY LINER.
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED CRACK S TUCCO AT EXPOSURE1,EXPO#2 & #4 AT VARIOUS FLOORS.ALSO DAMAGED WINDOW L INTEN AT EXPOSURE#1.REMEDY:COMPLY WITHCODE/REPAIR FACADE AS PER CODE
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED SEVERE CRACKING ON EXP 1,2,4 STEP CRACKING VERTICAL AND HORIZONTAL AT MULTIPLE LOCATION. OBSERVED DAMAGED WINDOW SILLS. REMEDY: COMPLY WIHT CODE, REPAIR AND/OR REPLACE
INTERIOR RENOVATION TO APT 11C. NO CHANGES IN USE, EGRESS OR OCCUPANCY.
APPLICATION IS FILED FOR INTERIOR ALTERATION TO EXISTING APARTMENT ON THE 11TH FLOOR; INCLUDES REMOVAL AND REPLACEMENT OF INTERIOR FINISHES AND PARTITIONS. ALTERATION OF BATHROOM FIXTURES, INSTALLATION OF HVAC UNITS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Plumbing Application in conjunction with Alteration Type 2 to renovate Apartment 11C
FTM BLDG EXTERIOR FACADE AND APPURTENANCES. NOTED MANY CRACKS AT STUCCO LAYERS IN ALL EXPOSURES. REMEDY: MAINTAIN BLDG EXTERIOR FACADE, PROVIDE SAFETY MEASURES, REPAIR DEFECTIVE FACADE AS PER 1 RCNY 103-04
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER 291213(060320CLL0602JC) ISSUED ON 06/03/2020. AS OF 08/06/2021 OWNER HAS NOT COMPLIED WITH CURE ORDER. REMEDY: IMMED COMPLY WITH CODE AND COMMISSIONER'S ORDERS
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ENTIRE BUILDING
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. BUILDING HAS DAMAGED MASONRY THROUGHOUT FACADE. CRACKS, SPALLING, DETERIATION FOUND ON FACADE. REMEDY: MAINTAIN BUILDING EXTERIOR FACADE, COMPLY WITH CODE
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
Installation of Sidewalk Shed as per plans.
Judgment: NO