Filing herewith plumbing modifications as per plans.
Filing herewith mechanical modifications as per plans
Filing herewith general construction to include interior renovation and minor demo as per plans.
Filing herewith sprinkler modifications as per plans
0 infested unit(s) reported
NYU Residence Hall, Facade repairs as per the plans filed: Removal/replacement/repairs to cracked/ spalled concrete & masonry units, existing steel lintel and spandrel beams. Scraping and painting of existing steel lintels. Masonry re-pointing.
STORAGE OF MATERIAL / EQUIPMENT ON TOP OF SIDEWALK SHED. STORAGE SHALL NOT EXCEED 50 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
file PL for deli store at 001, no change in use, egress or occupancy
FILE MECH WORK FOR THE DELI STORE , NEW HVAC SYSTEM , DUCTWORK ECT AS PER PLANS , NO CHANGE IN USE, EGRESS OR OCCUPANCY
renovation of of a deli store at 001, no change in use, egress or occupancy
Installation of suspended scaffold for facade inspection/repair.
Instillation of a new water source heat pump and associated ductwork to condition the existing dishwash area. The existing condenser water loop that is passing through the space will be tapped and run to the new unit.
Reconfiguration of interior non-bearing partitions as shown on drawings submitted herewith.
0 infested unit(s) reported
RENOVATION OF EXISTING STORE, INCLUDING REMOVAL AND INSTALLATION OF PARTITION. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
RENOVATION OF EXISTING STORE, INCLUDING REMOVAL AND INSTALLATION OF PARTITION. NO CHANGE INUSE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
HEREWITH FILING FOR GENERAL CONSTRUCTION TO REPLACE TURNSTILES AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
plumbing fixtures modifications, install new distribution piping and SP heads as indicated on plans submitted herewith.
plumbing fixtures modifications, install new distribution piping and SP heads as indicated on plans submitted herewith.
removal and replacement of HVAC systems partially serving SC-2, including ductwork and HVAC split units as indicated on plans submitted herewith.
interior renovation of the Steinhardt Art Studios
No description available
INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No description available