662 3 AVENUE, Manhattan, NY, 10017 · New York City · 85 total events
Temporary Installation in Auditorium at 3RD FL to be removed after event
Installation of 20 heads at shared lobby space
Replacement of lighting in existing ceilings as per drawings filed herewith. No change in use, egress, or occupancy.
Portion of existing slab to be partially removed for new HSS installation, remove existing curb, new concrete flood curb, new CMU curb.
INSTALLATION OF NEW NON-BEARING PARTITIONS, NEW OFFICE FRONT AND DOORS, INSTALLATION OF NEW CEILING AND FINISH AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Minor Water and Sanitary piping work. No new plumbing fixtures being installed, no plumbing fixture modification.
DEMOLITION OF INTERIOR MILLWORK AND FINISHES PER INDICATED SCOPE. INSTALLATION OF NEW NON-BEARING PARTITIONS, NEW OFFICE FRONT AND DOORS, INSTALLATION OF NEW CEILING ANDFINISH AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Temporary Installation in Auditorium at 3RD FL to be removed after event
Addition of short runs of ductwork and piping to serve phone rooms. No change to use, egress, or occupancy.
Rebalancing of existing precipitator and additions to associated ductwork as per plans filed herewith. No change in use, egress, or occupancy.
Filing for installation and relocation of sprinkler heads and related piping as per plans filed herewith. No change to use, egress, or occupancy.
Addition of short runs of ductwork to serve phone rooms. No change to use, egress, or occupancy.
Corridor niche renovations to create additional phone rooms on 2nd and 4th floor. No change to use, egress, or occupancy.
Temporary Installation in Auditorium at 4TH FL to be removed after event
Modification to existing plumbing fixtures and associated piping for Foothouse Bar.
Modification to existing plumbing fixtures and associated piping for Rooftop Restaurant
Modification to existing plumbing fixtures and associated piping for Foothouse Restaurant
Filing for construction of temporary structure of plywood, aluminum, and laminate as per plans filed herewith. No changes to use, egress, or occupancy.
GENERAL CONSTRUCTION OF CITY WINERY 5FL ROOFTOP RESTAURANT. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
Modification to existing mechanical system for Rooftop Restaurant
Modification to existing mechanical system for Foothouse Restaurant.
Structural work to include new raised concrete slab to meet existing slab elevation for Rooftop restaurant. Concrete curb for RTU, create new duct opening @ existing slab, blocking for roof membrane install.
Structural work including new raised concrete slab for Foothouse Restaurant.
GENERAL CONSTRUCTION OF CITY WINERY FOOTHOUSE RESTAURANT. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
The project referenced by this submittal consists of an indoor temporary plywood structure that is bolted to a stage and rigged to a pipe structure.
Filing for installation of temporary structure consisting of TV monitors mounted steel piping and aluminum truss.
Temporary Installation in Auditorium at 4TH FL to be removed after event
REMOVE EXISTING SANITARY AND VENT PIPING AND PROVIDE NEW 2 SANITARY AND NEW 2 VENT PIPING CONNECTED TO EXISTING PIPING.
INSTALL SPRINKLER IN NEW STAIRCASE. CONNECT TO EXISTING SPRINKLER MAIN.
Installation of architectural cladding as per plans filed herewith. No change in use, egress, or occupancy.
Temporary Installation in Auditorium at 4TH FL to be removed after event
Modification to existing sprinkler system for concession.
Modification to existing sprinkler system for foothouse restaurant
Modification to existing sprinkler system for Rooftop restaurant.
Modification to existing plumbing fixtures and associated piping for Concession
Structural work including new raised concrete slab for Foothouse Bar.
Structural work to include new raised concrete slab to meet existing slab elevation for Concession. Concrete curb for RTU, create new duct opening @ existing slab, blocking for roof membrane install.
Modification to existing mechanical systems for Concession.
GENERAL CONSTRUCTION OF CITY WINERY SPACE (CONCESSION). NO CHANGE IN OCCUPANCY, USE OR EGRESS.
GENERAL CONSTRUCTION OF CITY WINERY FOOTHOUSE BAR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On-site fabrication and installation of 3 I-beam gateways/arches bolted together with attachment to floor in support of architectural cladding as per plans filed herewith. No change in use, egress, or occupancy.
Subsequent filing for temporary construction of stage, screens, scenic pieces, and monitor supports related to TPA event filed under job M00929640-I1.
Filing for temporary construction of stage, screens, scenic pieces, and monitor supports related to TPA event filed under job M00929640-I1.
ERECT ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER MEDALLION WALL SIGN-A, INSIDE OF PROPERTY LINE, NO CHANGE TO USE, EGRESS OR OCCUPATION
ERECT NON-ILLUMINATED ACCESSORY D/F BLADE WALL SIGN-C, NON-FLASHING, INSIDE OF PROPERTY LINE, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
ERECT NON-ILLUMINATED ACCESSORY D/F BLADE WALL SIGN-D, NON-FLASHING, INSIDE OF PROPERTY LINE, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
ERECT NON-ILLUMINATED ACCESSORY D/F BLADE WALL SIGN-B, INSIDE OF PROPERTY LINE, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
STRUCTURAL REINFORCEMENT FOR ELEVATOR REMOVAL AND INSTALLATION OF CONVENIENCE STAIR. NEW STEEL FRAMING TO SUPPORT 1FL SLAB AND REMAINING ESCALATOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
MINOR MODIFICATION TO DUCTWORK RELATED TO ELEVATOR REMOVAL AND STAIR INSTALL.
REMOVAL OF ELEVATOR AND INSTALLATION OF CONVENIENCE STAIR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.