655 3 AVENUE, Manhattan, NY, 10017 · New York City · 23 total events
Herewith filing to install new plumbing fixtures and sprinkler system in conjunction with ALT 1 application# B00671104-I1.
Herewith filing the mechanical scope of work in conjunction with ALT 1 application B00671104.
Filing herewith to install a green roof in conjunction with Alt-NB-CO B00671104-I1.
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (GREEN WOOD)
INSTALLATION OF 300 PSF SIDEWALK SHED, CONSTRUCTION FENCE AND ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 300 PSF SIDEWALK SHED, CONSTRUCTION FENCE AND ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALL 13' WIDE CURB CUT (INCLUDING 2.5' WIDE SPLAYS).
Herewith filing civil work to be performed in conjunction with ALT 1 application #B00671104.
Filing for plumbing work as per plans submitted. The scope is in conjunction with Alt-CO-NB filed under B00671104.
Herewith filing to install new plumbing fixtures and sprinkler system in conjunction with ALT 1 application# B00671104-I1.
FILING HEREWITH FOR AN ALTERATION TYPE 1 WITH AN ENLARGEMENT, EXCEEDING 110% OF EXISTING FLOOR AREA.
Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF 300PSF SIDEWALK SHED, ROOF PROTECTION AND CONSTRUCTION FENCE AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022. NO USE IN EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 300PSF SIDEWALK SHED, ROOF PROTECTION AND CONSTRUCTION FENCE AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022. NO USE IN EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
FILING FOR PARTY WALL BRACING AS PER PLANS SUBMITTED IN CONJUNCTION WITH ALT-CO-NB.
FILING FOR SOE IN CONJUNCTION WITH B00671104-I1. (see plans for detailed scope of work)
FILING FOR PARTY WALL BRACING AS PER PLANS SUBMITTED IN CONJUNCTION WITH ALT-CO-NB.
HEREWITH FILING THE STRUCTURAL SCOPE OF WORK FOR ALT 1 APPLICATION# B00671104-I1.
Herewith filing the foundation scope of work in conjunction with ALT 1 application #B00671104-I1.
Installation of new underground 42 diameter HDPE pipe detention system and associated HDPE and CIP/DIP conveyance.
INSTALLATION OF 8' HIGH CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Installation of pipe scaffolding as per plan and in accordance with Chapter 33 of the NYC 2014 Building Code. No change in use, egress, or occupancy.
SLOPED ROOF GLAZING REPLACEMENT AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION.