607 WEST 113 STREET, Manhattan, NY, 10025 · New York City · 10 total events
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES ANDMETHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Subsequent mechanical filing for Job # M01029229-I1
Subsequent plumbing filing for job# M01029229-I1
INTERIOR RENOVATION TO APARTMENT UNIT 51. NON STRUCTURAL DEMOLITION. INSTALLATION OF NEW PARTITIONS CEILING, LIGHTING AND FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY. NO WORK TO WINDOWS AND FAADE
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Facade restoration. No change in egress, use or occupancy.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Plumbing modifications in conjunction with NYC DOB BIS Job # 140909097. No change to use egress or occupancy proposed.