Modifications to the existing Sprinkler System: Install (1) new head on 2, 3, 5 & 15th Floors; (17) new heads on 6, 9 & 10th Floors; (18) new heads on the 12th Floor and associated sprinkler piping as per plans (Sprinkler System Upgrade.)
INSTALLATION OF INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.
Minor interior demo; Install two new demising partitions with maglock doors on the 2nd Floor as per plans (Publicis.) No change to use, egress or occupancy.
Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
New mechanical system at ground floor space, installation of commercial cooking and exhaust system in first floor kitchen
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification to existing Sprinkler system & plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification to existing Sprinkler system & plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
ENTIRE BUILDING
ADDITION OF 78 NEW SPRINKLER HEADS TO THE GROUND FLOOR SPACE. NO RELOCATIONS AND REMOVALS.
Removal and installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change in use, egress or occupancy.
Modifications to existing HVAC system. No change to use, egress or occupancy
PROVIDING RAISED CONCRETE ON INSULATION AND STRUCTURAL REINFORCING FOR A GREASE TRAP OPENING ON THE 1ST FLOOR. PROVIDE HUNG MECHANICAL PLATFORM ABOVE 1ST FLOOR.
Modifications to the Plumbing System: Install new fixtures: (4) Floor drains, (2) Funnel drain, (2) HWH, (1) WC, (1) Lav, (1) sink, (1) DW, (2) WD, (2) CM, (1) ref w/ IM and associated CW/sanitary piping on the 1st Floor as per plans (Harbor Picture Co.)
Install new fixtures: (2) sinks, (2) DW, (2) WD, (2) CM, (1) refrigerator w/ IM, (3) HWH, (2) Funnel drain, (4) Floor drain, (1) WC, (1) Lavatory and associated CW/sanitary piping on the 10th Floor as per plans (Harbor Picture Co - Office Buildout.)
Remove (172) heads, Relocate (2) heads, Install (268) new heads and (6) temporary heads on the 10th Floor; Remove (6) heads and Relocate (9) heads on the 13th Floor as per plans (Harbor Picture Co - Office Buildout.) No change to use, egress or occupancy.
Modifications to the existing Sprinkler System: Remove (54) existing Sprinkler heads and install (69) new sprinkler heads and associated piping on the 1st Floor as per plans (Harbor Picture Co.) No change to use, egress or occupancy.
Modifications to existing HVAC system; Removal ductwork and install new ductwork, diffusers, water cooled VRF condensing units and piping on the 10th & 13th Floor as per plans (Harbor Picture Co - Office Buildout.) No change to use, egress or occupancy
Structural Modifications: Infill of existing ramp, interior CMU wall reinforcement and install load bearing walls on the 1st Floor as per plans (Harbor Picture Co.) No change to use, egress or occupancy.
Minor interior demolition. Install new interior drywall partitions, doors, suspended ceilings, flooring and finishes on the 10th Floor as per plans (Harbor Picture Co - Office Buildout.) No change to use, egress or occupancy.
Minor interior demolition. Install new interior drywall partitions, doors, suspended ceilings, flooring and finishes on the 1st Floor as per plans (Harbor Picture Co.) No change to use, egress or occupancy.
Structural Modifications: Structural Steel reinforcement for openings and install load bearing walls on the 10th Floor and 11th Floor framing as per plans (Harbor Picture Co - Office Buildout.) No change to use, egress or occupancy.
Modifications to existing HVAC system; Removal ductwork and install new ductwork, diffusers, water cooled VRF condensing units and piping on the 1st Floor as per plans (Harbor Picture Co.) No change to use, egress or occupancy
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
INTERIOR NON-STRUCTURAL DEMOLITION AND NEW PARTITIONS, NEW FINISHES AND FIXTURE ONLY TAKING PLACE ON THE GROUND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Plumbing work at the ground floor space.
Minor Interior Demolition; Removal of interior partitions, doors, suspended ceilings, flooring and finishes, and install new decorative screen over louver as per plans (GEM Restaurant - Demo/ Whitebox.) No change to use, egress or occupancy.
Modifications to the existing HVAC System: Removal AC Unit, exhaust fan and ductwork. Install new louver on the 1st Floor as per plans (Gem Restaurant.) No change to use, egress or occupancy.
Remove (2) Floor Drains, accessories and cap associated piping back to main on the 3rd Floor as per plans (Verizon Office Renovation.) No change to use, egress or occupancy.
Modifications to the existing Sprinkler System: Remove (3) sprinkler heads, Relocate (12) sprinkler heads and Install (3) new heads and associated piping on the 3rd Floor as per plans (Verizon Office Renovation.) No change to use, egress or occupancy.
Minor interior demolition. Install new interior drywall partitions, doors, suspended ceilings, flooring and finishes on the 3rd Floor as per plans (Verizon Office Renovation.) No change to use, egress or occupancy.
Modifications to existing HVAC system; Miscellaneous ductwork modifications and installation of grilles on the 3rd Floor as per plans (Verizon Office Renovation.) No change to use, egress or occupancy
Modifications to the existing HVAC System. Removal of ductwork and piping. Install new AC Unit, new supply and return ductwork, mixing plenum, new condenser water piping and new valved capped outlets on the Cellar Level as per plans (HVAC Upgrade.)
Modifications to the existing Sprinkler System: Remove (31) sprinkler heads and Install (2) new temporary sprinkler heads and associated Sprinkler piping on the 1st Floor as per plans (GEM Restaurant - Demo & Whitebox.)
Removal of existing fixtures: (4) sinks, (4) HBs, (1) FD, (1) HWH, (1) WC, (1) Lavatory, (1) grease trap and associated CW/sanitary piping on the 1st Floor as per plans (GEM Restaurant - Demo & Whitebox.) No change to use, egress or occupancy.
GARBAGE/RECYCLING STORAGE
Remove (3) sinks, (4) HWHs, (1) Floor drain, (2) lavatories, (2) water closets, (3) drinking fountains and associated CW/sanitary piping as per plans (Publicis - Digitas/ Demo.) No change to use, egress or occupancy.
Modifications to the existing Sprinkler System: Remove (23) existing sprinkler heads, Relocate (101) sprinkler heads and Install (20) new sprinkler heads and associated Sprinkler piping on the 14th Floor as per plans (Publicis/ Pfizer Buildout.)
REM/REP: (12) Lav, (13) WC, (4) UR on 7-12th Floors and (12) Lav (10) WC, (3) UR on 13-15th Floors; Install NEW: (2) Hot water heaters and (2) Funnel drains and associated piping on 7-15th Floors (Core Restrooms). No change to use, egress or occupancy.
Removal of existing fixtures and piping; Install new (2) HWH, (2) drinking fountains, (3) FD, (1) sink, (1) Ice maker, (2) Lavatories, (1) WC and associated CW/sanitary piping on the 14th Floor as per plans (Pfizer Buildout.)
Modifications to the existing HVAC System: New duct distribution, install new supplemental AC unit. Re-connect existing duct in other areas, install new VAV's and diffusers at new ceilings on the 14th Floor as per plans (Publicis/ Pfizer Buildout.)
Minor Interior Demolition; Installation of new drywall, ceilings, office fronts, doors/hardware, flooring, cafe/millwork and finishes as per plans (Pfizer Buildout Phase.) No change to use, egress or occupancy.
Minor interior demolition. Install new interior drywall partitions, doors, suspended ceilings, flooring, curtains and finishes on the 15th Floor as per plans (Le Truc - The Pub (Publicis).) No change to use, egress or occupancy.
Modifications to existing HVAC system; Installation of new air outlets, reworking of existing ductwork & relocation of existing HW piping and accessories on the 15th Floor as per plans (Le Truc - The Pub (Publicis.)) No change to use, egress or occupancy.
Structural Modifications: Installation of supplemental supportive steel for hanging of pipe grid on the 15th Floor as per plans (Le Truc/ The Pub (Publicis.) No change to use, egress or occupancy.
Minor interior demolition: Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 14th Floor as per plans (Pfizer - Demo Phase.) No change to use, egress or occupancy.
Modifications to the existing Sprinkler System: Install (6) new sprinkler heads, Relocate (6) sprinkler heads, Remove (4) existing sprinkler heads and associated piping on 15th Floor (Le Truc - The Pub (Publicis.)) No change to use, egress or occupancy.
Modifications to the existing Sprinkler System: Relocate (13) existing sprinkler heads and associated piping and install (1) new head and associated piping on the 13th Floor (Publicis - Walmart.) No change to use, egress or occupancy.
Modifications to the existing HVAC System: Installation of new AC Units on 6th Floor & Partial 7th Floor as per plans (HVAC Replacement - Phase 5.) No change to use, egress or occupancy.