547 5 AVENUE, Manhattan, NY, 10176 · New York City · 15 total events
Replacement/modifications to Elevator machine room HVAC system as indicated on plans submitted herewith.
Removal and replacement of exhaust fans, air handler unit and associated duct work at roof level. Piping modifications at bsmt. New 4 hot water return. and hot water supply service lines from bsmt. to 11th fl. No change in egress, occupancy, or use.
Modifications to mechanical systems as per plans submitted.
INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filing herewith application for sidewalk vault repairs. No change in use, egress or occupancy.
Sprinkler Modifications as per plans submitted.
Post Approval Amendment to remove Concrete work scope of work.
Modifications to the existing HVAC system to include new fan units and related duct work, new exhaust fans, and associated mechanical piping as per plans submitted herewith. No Change to Use, Occupancy, or Egress.
installation of a temporary sprinkler loop on 4th and 6th floors. no change in use, egress or occupancy.
Sprinkler removals on 4th and 6th floor.
Installation of new plumbing fixtures as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Mechanical system removals pertaining to interior build out. no change in use, egress or occupancy.
FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.