532 1 AVENUE, Manhattan, NY, 10016 · New York City · 31 total events
HEREWITH FILING SPRINKLER MODIFICATIONS IN CONJUNCTION WITH MAIN LOBBY RENOVATIONS PER PLANS.
INTERIOR ALTERATION WITHIN EXISTING TENANT SPACE ON 3RD FLOOR IN EXISTING BUILDING: INSTALL NEW SUB-METER AND RPZ. INSTALL NEW PLUMBING FIXTURES PER DENTAL OFFICE NEEDS. MODIFY EXISTING / INSTALL NEW SPRINKLER HEADS PER NEW LAYOUT. NO CHANGE TO OCCUPANCY,
INTERIOR ALTERATION WITHIN EXISTING TENANT SPACE ON 3RD FLOOR IN EXISTING BUILDING: INSTALL NEW SUB-METER AND RPZ. INSTALL NEW PLUMBING FIXTURES PER DENTAL OFFICE NEEDS. MODIFY EXISTING / INSTALL NEW SPRINKLER HEADS PER NEW LAYOUT. NO CHANGE TO OCCUPANCY,
INTERIOR ALTERATION WITHIN EXISTING TENANT SPACE ON 3RD FLOOR IN EXISTING BUILDING: NEW NON-BEARING INTERIOR PARTITIONS, NEW INTERIOR FINISHS, NEW MILLWORK, MODIFY / ADD NEW DUCTWORK AND DIFFUSERS PER NEW FLOOR LAYOUT. NO CHANGE TO EXISTING HVAC UNIT
HEREWITH FILING MECHANICAL MODIFICATIONS IN CONJUNCTION WITH LOBBY RENOVATIONS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
HEREWITH FILING RENOVATIONS IN THE MAIN LOBBY PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filing herewith plans showing partial demolition of access stair in existing NE retail space on 1st floor and, Cellar level. No change in Use, egress or occupancy under this application.
Filing herewith plans showing structural work for concrete slab infill in existing NE retail store on the 1st floor. No change in Use, Egress or Occupancy under this application.
Modifications to existing sprinkler system at existing NE retail space as per plans filed herewith. No Change in Use, Egress or Occupancy under this application.
Filing herewith plans showing partial non-structural demolition work in existing NE retail space on 1st floor and, Cellar level. No change in Use, egress or occupancy under this application.
Filing herewith plans showing removal of plumbing fixtures, and associated piping, in eisting NE retail store, on the Cellar level. No change in Use, Egress or Occupancy under this application.
Filing herewith plans showing removal of mechanical equipment, and associated accessories, at NE retail space on the 1st and Cellar levels. No change in Use, Egress or Occupancy under this application.
Filing herewith plans showing removal of plumbing fixtures, and related piping, on the Cellar Level. No change in Use, Egress or Occupancy under this application.
Filing herewith plans showing partial non-structural demolition work in existing retail spaces, in Cellar level. No change in Use, egress or occupancy under this application.
Filing herewith plans showing removal of mechanical equipment, and associated accessories, on the Cellar. No change in Use, Egress or Occupancy under this application.
See comments
Filing herewith plans showing removal of plumbing fixtures, and related piping, on 1st and 2nd floor. No change in Use, Egress or Occupancy under this application.
Filing herewith plans showing removal of mechanical equipment, and associated accessories, on 1st and 2nd floor. No change in Use, Egress or Occupancy under this application.
Filing herewith plans showing partial non-structural demolition work in existing retail spaces, on 1st and 2nd Floors. No change in Use, egress or occupancy under this application.
Filing herewith application for sprinkler modifications as per plans submitted. No change in use, egress or occupancy.
Filing herewith application for interior renovations on 11th floor. No change in use, egress or occupancy.
Filing herewith for Mechanical modifications on 11th floor as per plans submitted. No change in use, egress or occupancy.
GENERAL CONSTRUCTION TO REMOVE AND INSTALL INTERIOR PARTITIONS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Herewith filing for installation of new sprinkler heads and associated piping on sub-cellar, cellar, 1st thru 9th, 11th and 12th floors as indicated on plans.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
12th floor office renovations requiring modifications to the existing sprinkler systems. no change in use, egress or occupancy.
HEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON THE FIRST FLOOR (PLUMBING WORK). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
RE-FACE EXISTING NON-ILLUMINATED BLADE SIGN (SOURPATCH KIDS)
INSTALL NON-ILLUMINATED SIGN ON WALL (SOURPATCH KIDS)
Mechanical Modifications as per plans no change in use egress or occupancy.