523 WEST 112 STREET, Manhattan, NY, 10025 · New York City · 15 total events
PLUMBING WORK IN APT 32
interior renovation in apt 32
PORCH/BALCONY
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 81, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
SLOW LEAK
MOLD
FLOOR
INSPECTION SIGN-OFF FOR EXISTING A.O. SMITH HOTWATER HEATER (7384-02)
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
PROPOSED INTERIOR RENOVATION ON 3RD FLOOR UNIT 31. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
PROPOSED PLUMBING WORK ON 3RD FLOOR UNIT 31. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE
Repair of structural slab at ceiling
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT