500 WEST 18TH STREET, Manhattan, NY, 10011 · New York City · 30 total events
Addition of a dedicated reclamation room exhaust system as per plans filed herewith. No change in use, egress or occupancy under this application.
INTERIOR ALTERATION OF APARTMENT W31C ON THE 29TH CONSTRUCTION FLOOR/31ST MARKETING FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
0 infested unit(s) reported
Interior partitions & finishes as per plans filed here with to 25th floor units. No change to use, occupancy or egress.
HEREWITH FILING FOR MODIFICATION OF PLUMBING FIXTURES AND SPRINKLER HEADS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
HEREWITH FILING FOR MODIFICATION OF PLUMBING FIXTURES AND SPRINKLER HEADS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
HEREWITH FILING FOR MODIFICATION OF MECHANCIAL DUCTWORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Remove 1 bath including shower, lav, toilet, relocate 1 clothes washer, new 1 clothes washer. No change to use, egress, or occupancy.
Relocate 9 sprinkler heads, add 2 sprinkler heads, remove 5 heads. No change to use, egress, or occupancy.
Mechanical systems work in connection with the interior renovation of the existing residential unit #28A. No change in use, occupancy or egress with this filing.
Sprinkler work associated with the interior renovation of the existing residential unit #28A. No change in use, occupancy or egress with this filing.
Plumbing work in connection with the interior renovation of the existing residential unit #28A. No change in use, occupancy or egress with this filing.
Interior renovation of the existing residential unit #28A. No change in use, occupancy or egress with this filing.
General Construction work to include interior renovation of Penthouse 26/PH 26 as shown on plans. No change to use, egress, or occupancy.
Mechanical work as shown on plans (Penthouse 26/PH 26).
Structural work as shown on plans (Penthouse 26/PH 26).
Modification to existing ductwork and grilles. No change to use, egress, or occupancy.
HEREWITH FILING FOR INTERIOR PARTITIONS AND DOORS MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Interior renovation to existing apartment #6A part of the west tower . work involve remove and construct non bearing partitions . and millwork were required , all as per plan. no change in use egress or occupancy..
Install new concrete pads under new pergola posts for unit 6E East Terrace.
RENOVATION OF UNIT #6E, A DUPLEX ON 4TH AND 5TH FLOORS, WITH WORK ON PRIVATE 5TH FLOOR TERRACE. REMOVAL/INSTALLATION OF NON-LOADBEARING PARTITIONS AND CEILING.
Modifications to an existing sprinkler system (Penthouse 26 / PH 26).
MODIFICATION OF PLUMBING FIXTURES IN BATHROOMS & KITCHEN IN UNIT PH32B-W AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PARTIAL RENOVATION OF EXISITNG UNIT PH32B-W. WORK TO INCLUDE REMOVAL & INSTALLATION OF PARTITIONS & FINISHES AS PER PLANS. NO CHANG IN USE, EGRESS OR OCCUPANCY.
Plumbing work as shown on plans (Penthouse 26 / PH 26).
Plumbing filed in conjunction to GC for apartment combo of units 29A and 29D on 27th floor. No change in use, occupancy or egress.
Interior renovation/combo of units 29A and 29D on the 27th floor on an existing MDL building. Renovation includes apartment combination as per TPPN 3/97 and transferred portion of the common hall. No change in use, occupancy or egress
INTERIOR RENOVATION OF EXISTING APT. 15D IN THE EAST TOWER. REMOVAL OF BATHTUB AND REPLACEMENT OF (2) LAVATORIES IN EXISTING BATHROOM #1 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Proposed interior alteration to existing dwelling unit 15D in the East Tower. Minor demolition of non-bearing walls, doors and finishes. Installation of new non-bearing walls, finishes and doors. No change to use, egress or occupancy.
REMOVAL OF ONE (1) NON-LOAD BEARING PARTITION ANDONE (1) DOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.