50 CENTRAL PARK WEST, Manhattan, NY, 10023 · New York City · 42 total events
Modifications to existing HVAC system.
Call
Proposed temporary structural shoring and bracing, including means and methods during demolition and construction associated with structural modification filed under M01227266-S3.
Modification to existing plumbing fixtures and piping
outrigger system installation and inspection filing for facade repairs.
INSTALLATION OF A SUPPORTED SCAFFOLD IN THE COURTYARD AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD SHALL COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
INSTALLATION OF A TEMPORARY CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
Structural modifications to the base building structure of residential units 11B and 12BC to accommodate new stairs runs, a new dumbwaiter shaft, a new skylight and a mezzanine extension.
INTERIOR RENOVATION OF EXISTING APARTMENTS (11B & 12BC). THE SCOPE OF THE WORK IS LOCATED IN A 1907 BEAUX-ARTS MULTI-FAMILY RESIDENTIAL BUILDING IN THE UPPER WEST SIDE / CENTRAL PARK WEST HISTORIC DISTRICT.
FACADE RESTORATION INCLUDING BRICK REPLACEMENT, BRICK REPOINTING, TERRA COTTTA PATCHING & TERRA COTTA REPLACEMENT WITH GFRC AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Proposed installation of a temporary pipe scaffolding as per plans submitted. Work shall comply with building code, chapter 33. No changes in use, egress or occupancy.
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2020 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF A TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. ENCLOSURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33
Outriggers system installation for facade repairs.
Call
INSTALLATION OF TEMPORARY STAIR TOWER AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
Renovate an existing old-code apartment. Existing interiors removed. Install new: partitions, kitchen, bathrooms, powder room; laundry; flooring; millwork; doors/casings. No change to occupancy / use, egress or fire-protection under this application.
Structural work in conjunction with proposed general construction to remove dumbwaiter shaft and chimney flues and support structurally. No change to occupancy / use, egress, fire protection under this application.
Install new HVAC system, as well as kitchen and bathroom / powder room exhaust in conjunction with proposed general construction. No change to occupancy / use, egress or fire-protection under this application.
Proposed installation of a temporary heavy duty 300PSF sidewalk shed as per plans submitted. Work shall comply with 2022 building codes, chapter 33. No change in use, egress or occupancy.
Plumbing work in conjunction with proposed general construction including cap/removal of gas range and meter, and relocated and new plumbing fixture installations. No change to occupancy / use, egress or fire-protection under this application
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 9C ON THE 9TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
EXISTING LOW PRESSURE GAS SERVICE, NEW GAS LINE (2) NEW GAS TRAINS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
INSTALL (1) NEW COMBINATION GAS/OIL BURNER ON (1) NEW LP BOILER. IN CONJUNCTION WITH REPLACEMENT (1) BOILER/BURNER FILED UNDER APPLICAITON M00859938. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
REPLACEMENT (1) NEW LOW PRESSURE BOILER AND (1) NEW COMBINATION GAS/OIL BURNER IN CONJUNCTION WITH M00860698. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
STRUCTURAL WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 9C ON THE 9TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INTERIOR RENOVATION OF APARTMENT 9C ON THE 9TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PERFORM MECHANICAL WORK INCONJUNCTION WITH APT#7B RENOVATION. INSTALL A/C UNITS , REPLACE EXHAUSTS AND ASSOCIATED DUCTWORK. GENERAL CONSTRUCTION AND PLUMBING WORK FILED UNDER SEPERATE APPLICATIONS. NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Replacement of gas piping with new exterior risers
Mechanical air conditioning at apartment 1A/2A at the first and second floor as per plans filed herewith.
INTERIOR RENOVATION OF BATHROOM AREA IN APARTMENT #9C; DEMOLITION OF INTERIOR NON-LOADBEARING PARTITIONS; CONSTRUCTION OF NEW PARTITIONS; INSTALLATION OF NEW FINISHES NO CHANGE TO USE, EGRESS OR OCCUPANCY.
PERFORM PLUMBING MODIFICATION WORK INCONJUNCTION WITH APT#7B RENOVATION. CAP AND REMOVE EXISTING GAS PIPING & EQUIPMENT. GENERAL CONSTRUCTION & MECHANICAL WORK FILED UNDER SEPERATE APPLICATIONS. NO CHANGE TO USE, EGESS, OCCUPANCY OR FIRE PROTECTION.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
INSTALLATION OF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED LIVE LOAD WILL BE 300 PSF, SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Installation of Plumbing fixtures
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND 114' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED AND PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND 114' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED AND PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.