454 7 AVENUE, Manhattan, NY, 10123 · New York City · 20 total events
Filing to replace Chiller on 1st floor and Chilled water Air Handling Unit on 3rd floor with associated controls, existing ductwork to remaining and modified as required by new units.
Installation of suspended scaffold for facade inspection/repair.
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
FACADE RESTORATION INCLUDING LINTEL AND FACE BRICK REPLACEMENT, STONE REPOINTING AND SEALANT REPLACEMENT AS PER PLANS SUBMITTED. NO CHANGE IN USE,OCCUPANCY OR EGRESS.
Installation of a temporarily heavy-duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporarily heavy-duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing for minor construction of concrete pads in support of 1st floor Chiller and 3rd Floor A/C Unit replacement.
Filing for the installation of NEW Steel dunnage on the 1st floor to support chiller.
DEMOLISH EXISTING PRESSURE REDUCING VALVES (PRV) IN THE STEAM ROOMS AND ALL ASSOCIATED PNEUMATIC PIPING. REPLACE WITH NEW ELECTRONIC PRVs. REPLACE EXISTING INSIDE SERVICE MOTORIZED VALVE AND ASSOCIATED AUTOMATIC SHUT OFF PANEL. BLANCE NEW EXHAUST FAN.
Removal & Replacement of AC-14
VFD INSTALLATION AS SHOWN ON THE DRAWINGS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Mechanical work related to the Replacement of the Rooftop Air Handling Unit
General construction work related to the installation of new AC unit on tenthfloor including renovation of current office space into New MER.
Installation of New AC unit and associated piping & ductwork on tenth floor
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
FACADE RESTORATION INCLUDING LINTEL AND FACE BRICK REPLACEMENT, MORTAR JOINT REPOINTING AND SEALANT REPLACEMENT AS PER PLANS SUBMITTED. NO CHANGE IN USE,OCCUPANCY OR EGRESS.
Modification to the existing Sprinkler System
Replacement of 4th Floor Air Handler including related ductwork, louvers, piping, and fans.
Install new water service, remove existing booster pumps with install of triple booster pump in conjunction with removal of existing water tanks on roof
INSTALLATION OF SYSTEM SCAFFOLD ON ROOF AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.