35 5 AVENUE, Manhattan, NY 10003 · New York City · 27 total events
0 infested unit(s) reported
NYU Rubin Hall exterior facade & roof repairs as per the plans filed including: Removal & Replacement of existing roofing system, Door & Drains. Parapet reconstruction. Infill slab opening. Repairs to stucco, structural steel & steel railings.
Plumbing, sprinkler, and standpipe modifications as per shown on plans filed herewith. Filed in conjunction with GC application M00635716, MS application M00636634, and ST application M00636808. No change in egress, occupancy, or use.
Plumbing, sprinkler, and standpipe modifications as per shown on plans filed herewith. Filed in conjunction with GC application M00635716, MS application M00636634, and ST application M00636808. No change in egress, occupancy, or use.
Fire protection modifications on penthouse floor as per shown on plans filed herewith. No change in egress, occupancy, or use.
Fire protection modifications on penthouse floor as per shown on plans filed herewith. No change in egress, occupancy, or use.
NYU Rubin Hall exterior facade & roof repairs as per the plans filed including: Removal & Replacement of existing roofing system, Door & Drains. Parapet reconstruction. Infill slab opening. Repairs to stucco, structural steel & steel railings.
Convert existing wet standpipe into dry air pressurized system for use during construction. No change to use, occupancy or egress.
Plumbing, sprinkler, and standpipe modifications as per shown on plans filed herewith. Filed in conjunction with GC application M00635716, MS application M00636634, and ST application M00636808. No change in egress, occupancy, or use.
TEMPORARY FREESTRANDING STRUCTURE TO LATERALLY SUPPORT PERSONNEL HOIST IN CONJUNCTION JOB # M00832727-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installation of suspended scaffold for facade work or inspection. Amend #1, change in outrigger beam, added hoist , added outrigger detail detail
0 infested unit(s) reported
Renewal of SR23/440
Installation of sidewalk shed for public safety during construction work
STORAGE ON SIDEWALK SHED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
Interior, Facade rooftop modifications as per shown in plans filed herewith. Filed in conjunction with PL/SP/SD application M00636594, MS application M00636634, and ST application M00636808. No change in occupancy, egress, or use
INSTALLATION OF PIPE SCAFFOLD FOR CHIMNEY ACCESS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Mechanical Modifications as Shown per plans filed herewith. Filed in conjunction with GC application M00635716, PL/SP/SD application M00636594, and ST application M00636808. No change in egress, occupancy, or use.
Modification & additions to existing structure to support architectural and MEP renovations. Filed in conjunction with GC application M00635716, MS application M00636634, and PL/SP/SD application M00636594. No change in occupancy, egress, or use.
Installation of a temporary roof mock up for LPC review to determine visibility of future roof mounted equipment..
No description available
No description available
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
No description available
2017 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS (1 OR 2 FAMILY DWELLINGS)