2931 BROADWAY, Manhattan, NY, 10025 · New York City · 25 total events
0 infested unit(s) reported
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbe
INSTALL NEW ROOFING SYSTEM, REPAIR AND WATERPROOF PARAPETS, REPAIR AND INSTALL NEW CLADDING AT BULKHEAD AS PER PLANS FILED HEREWITH, NO CHANGE TO USE, EGRESS OR OCCUPANCY
INSTALLATION OF OUTRIGGERS FOR FACADE REPAIR AND INSPECTION.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Propose to perform interior renovation work in the apt 74 on the 7th floor. No change to use, egress or occupancy
PLUMBING MODIFICATION TO APARTMENT 104 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
INTERIOR RENOVATION TO APARTMENT 104 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
INTERIOR RENOVATION OF UNIT 63. PLUMBING TO BE FILED AS SUBSEQUENT APPLICATION. NO CHANGE IN USE EGRESS OR OCCUPANCY.
PLUMBING WORK IN CONUNCTION WITH INTERIOR RENOVATION OF UNIT 63. NO CHANGE IN USE EGRESS OR OCCUPANCY.
INSTALLATION OF PIPE SCAFFOLD AT 600 WEST 115TH STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
FACADE AND LL REPAIRS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF NEW SIDEWALK SHED AT 600 WEST 115TH STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Install new: (1) shower and (1) new washer and associated piping; Relocate (2) Lavatories, (2) Water Closets, (1) Bathtub, (1) dishwasher, (1) sink and associated piping as per plans (Apt #62 - Kern Residence.) No change to use, egress or occupancy.
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes as per plans (Kern Residence - Apt #62.) No change to use, egress or occupancy.
Structural work for Sidewalk Vault repairs, concrete slab, new structural beams as per plans filed herewith.
APPLICATION FILED FOR STRUCTURAL WORK IN THE CELLAR AND ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
NON ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
APPLICATION FILED FOR MECHANICAL WORK IN THE CELLAR AND ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
APPLICATION FILED FOR PLUMBING WORK IN THE CELLAR AND ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
APPLICATION FILED FOR PLUMBING/SPRINKLER MODIFICATIONS/ADDITIONS TO EXISTING SPRINKLER SYSTEM ON DOMESTIC WATER SERVICE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
APPLICATION FILED FOR PLUMBING WORK IN THE CELLAR AND ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
ERECT A NON-ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
HEREWITH FILING TEMPORARY FENCE PERMIT AS PER PLANS.
Judgment: NO