2901 BROADWAY, Manhattan, NY, 10025 · New York City · 35 total events
WATER SUPPLY
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.
§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 9L, 10th STORY, 2nd APARTMENT FROM WEST AT NORTH
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 9L, 10th STORY, 2nd APARTMENT FROM WEST AT NORTH
§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT PUBLIC HALL, 1st STORY
WINDOW GUARD BROKEN/MISSING
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Facade restoration. No change in egress, use or occupancy.
Suspended scaffold application (CD5) Renewal
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Interior renovation of existig commercial store to a fast food retail store. No change to use egress or occupancy is proposed.
TO INSTALL KITCHEN DUCT AND FANS.
TO INSTALL COOKING AND PLUMBING FIXTURES FOR A KITCHEN AT EATING AND DRINKING. WORK TO INSTALL (3) F/D, (11) SINK, (1) 3-COM SINK, (1) G/T, (1) COMBI OVEN, (1) TILT SKILLET, (2) FRYER, (1) WOK RANGE, (1) HWH. TO REPLACE 1-W/C & 1-LAV.
INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
plumbing work associated with the apartment renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
interior renovation of a residential apartment as shown on plans filed herewith. no change to use, egress or occupancy.
Installation of 2 piece bathroom on an existing retail space on the ground floor and water piping in the basement.
installation of sprinkler fixture along with related piping.
installation of sprinkler fixtures along with related piping.
REMOVAL AND INSTALLATION OF MECHANICAL EQUIPMENT, DUCTWORK,TO PREPARE FOR NEW RETAIL SPACE. NO CHANGE TO EGRESS USE OR OCCUPANCY.
installation of duct work along with related mechanical units.
RELOCATE (4) EXISTING SP HEADS IN AN EXISTING RETAIL SPACE.
Mechanical work as shown on plans
Plumbing work as shown on plans. Relocate 1 WC, 1 LAV. Add 1 sub-meter, 5 FS, 3 FD, 1 SS, 3 sinks, 1 ice maker, 2 dishwashers, 6 water points, 1 grease trap and 1 electric water heater. Connection to existing sanitary at cellar.
Plumbing work associated with renovation of restaurant. No change to egress use or occupancy.
installation of plumbing fixtures along with related piping.
Sprinkler work associated with renovation of restaurant. No change to egress use or occupancy.
Mechanical systems including kitchen exhaust system for restaurant renovation. No change to egress use or occupancy.
Construction Fence on first floor. No change to egress use or occupancy