280 RECTOR PLACE, Manhattan, NY, 10280 · New York City · 10 total events
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco
REMOVE (1) EXISTING HOT WATER HEATER AND REPLACE (2) NEW HOT WATER HEATERS IN SAME PLACE AS PREVIOUSLY EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
TERRACE ROOF REPLACEMENT ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Replacing existing plumbing fixtures in existing location at existing bathroom and capping existing plumbing fixtures at existing kitchen in unit 9M, in conjunction with filed architectural job# M00945852-I1.
Minor non-structural partition layout changes in order to combine apartments 9N and 9M, and new finishes, fixtures and equipment throughout at apartment 9M.
HEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING APARTMENT #4K. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Sprint - Decommission of existing telecommunication site on the roof. Removal of antenna sectors and dunnage platform with related equipment on the roof and related conduits/cabling from roof to ground floor. No change in use, egress, or occupancy.
REPLACEMENT OF PLUMBING FIXTURES AND GAS EQUIPMENT
REMOVAL AND INSTALLATION OF INTERIOR PARTITION WALL
JOB FILED TO REPLACE EXIST. TOILET AND NEW SHOWER. NO CHANGE OF USE, EGRESS OR OCCUPANCY.