INSTALLATION AND USE OF TEMPORARY 1 TON DERRICK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
0 infested unit(s) reported
INTERIOR RENOVATION OF APT 5E ON THE FIFTH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF APT 5E ON THE FIFTH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
RENOVATION OF PENTHOUSE-SOUTH. PENETRATIONS + INFILL OF PH ROOF. REPLACE PH ROOF MEMBRANE, MODIFY SKYLIGHTS, WINDOWS, PARTITIONS, FIN FLOORS + CLG. REPLACE EXTERIOR BRICK VENEER + WATERPROOFING., REPLACE TERRACE PAVERS + PLANTERS. NEW RETRACT AWNINGS
NEW BRANCH DUCTWORK WITHIN PENTHOUSE SOUTH CONNECTED TO EXISTING ROOFTOP DUCTS AND EXISTING ROOFTOP HVAC UNITS. MODIFICATIONS TO EXHAUST DUCTING FOR KITCHEN AND BATHROOMS, MODIFICATION TO FLUES FOR EXISTING RELOCATED FIREPLACES.
PLUMBING WORK WITHIN EXISTING PENTHOUSE SOUTH APARTMENT.
Mechanical modifications and associated duct work. No change in use, egress or occupancy.
INTERIOR RENOVATION OF APT 5E ON THE FIFTH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Plumbing modifications (APT 14D) work to include replacement, relocation and addition of new fixtures as per plans filed herewith. No change in use egress or occupancy
RESIDENTIAL RENOVATION (APARTMENT 14D) PARTITIONS, DOORS AND CEILING MODIFICATIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Plumbing work filed in conjunction with the renovation of apartment 14E. Architectural & mechanical work filed under a separate application.
Renovation of apartments 2A as per plans. Mechanical and plumbing work to be filed under separate applications. No change of use occupancy or egress.
Mechanical work filed in conjunction with the renovation of apartment 2A. Architectural and plumbing work filed under separate applications. No change of use, occupancy or egress.
REPLACEMENT OF EXISTING BRICK VENEER AND CMU BACKUP WALLS OF PENTHOUSE SOUTH INCLUDING ALL STRUCTURAL WORK TO MODIFY WINDOWS, DOORS, AND SKYLIGHTS. NEW STEEL FRAMING FOR NEW PH ROOF AND RETRACT AWNINGS. PENETRATIONS AND INFILL OF DEFUNCT ROOF OPENINGS.
Plumbing work filed in conjunction with the renovation of apartment. 2A. Architectural & mechanical work filed under a separate application.No change of use, occupancy or egress.
EXTERIOR FACADE REPAIRS & MAINTENANCE AT ROOF LEVEL WATER TANK ENCLOSURE. NO CHANGE TO OCCUPANCY, USE, EGRESS OR BULK.
Proposed fit out for medical office to include new pantry, (6) exam rooms, (2) private offices, (2) toilets and storage. New interior partitions, windows, finishes, appliances, light fixtures, plumbing fixtures and required mechanical systems.
Scope includes new sinks at 6 exam rooms, 1 storage room, and pantry; as well as sinks and toilets at 2 toilets, and floor drain in mechanical room.
Mechanical work filed in conjunction with the renovation of apartment 14E. Architectural and plumbing work filed under separate applications. No change of use, occupancy or egress.
Renovation of apartments 14E as per plans. Mechanical and plumbing work to be filed under separate applications. No change of use occupancy or egress.
Plumbing work file in conjunction with apartment#9B renovation.
MECHANICAL WORK FILED IN CONJUNCTION WITH COMBINATION AND RENOVATION OF APARTMENT 11E AND 12E.. ARCHITECTRUAL, PLUMBING AND STRUCTURAL WORK FILED UNDER SEPARATE APPLICAIONS. NO CHANGE OF USE, OCCUPANCY OR EGRESS.
Renovation and combination of apartments 11E(11th fl.) and 12E(12th fl.) as per plans. Mechanical, structural and plumbing work to be filed under separate applications. No change of use occupancy or egress.
Structural work filed in conjunction with the combination of two existing apartments (apt. 11E/12E . No change in use, occupancy or egress.
Renovation of an existing apartment# 9B. work to include non-structural demolition, general construction as per plans filed herewith. No change to use, egress or occupancy.
Renovation of an existing apartment# 9B. work to include non-structural demolition, general construction as per plans filed herewith. No change to use, egress or occupancy.
Interior renovations at Apt 5C with partition, door, ceiling, and finish changes, adding through-wall opening for PTAC unit as per plans. Plumbing fixtures to be replaced in kind as ordinary repair (28-105.4.2.1). No change in use, egress, or occupancy.
Plumbing work filed in conjunction with the renovation and combination of apartment 11E and 12E. Architectural, mechanical and structural work filed under a separate application.
ENTIRE BUILDING
NEW, CAP & REMOVED, REPLACED AND RELOCATED PLUMBING FIXTURES W/ ASSOCIATED PIPING PER PLANS FILED. THERE IS NO CHANGE IN OCCUPANCY USE OR EGRESS
Four new masonry opening at apartment #9B on the ninth floor. No change in use, egress or occupancy.
MINOR PARTITION & CABINET REMOVAL, NEW PARTITIONS AND DOORS, DROPPED CEILINGS, NEW FINISHES AND CABINETS AS PER PLANS FILED. NO CHANGE TO OCCUPANCY USE OR EGRESS
Create openings in exterior wall for installation of sleeves for PTAC and AC units. No change in use, occupancy or egress under this application.
Plumbing work filed in conjunction with the renovation and combination of apartment 11E and 12E. Architectural, mechanical and structural work filed under a separate application.
INSTALLATION OF (2) 5 TON OUTDOOR AIR COOLED CONDENSING UNITS ON ROOF ACCU-1 & 2 (2) 4.5 TON INDOOR AIR HANDLER UNIT, AHU'S ARE LOCATED ON THE 14TH FLOOR IN THE CEILING.
INTERNAL
OWNER OR LICENSED CONTRACTOR
MAINTAIN WINDOW SASH
REPAIR EXTERIOR DOOR, RESET
REPAIR EXTERIOR DOOR FRAME
REPAIR EAVES
REPAIR WINDOW SILLS
REPAIR LINTELS
SERVICE WALK, PASSAGE, AREAWAY
REPLCE WINDOW PANES, PLEXGLAS
REPAIR EXTERIOR DOOR SILL
MAINTAIN PROJECTIONS
REPAIR GUTTER & DOWNSPOUT