2537 ADAM C POWELL BLVD, Manhattan, NY, 10039 · New York City · 76 total events
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT BUILDING ENTRANCE DOOR , 1st STORY
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 0; WG TO REPLACE = 0; WG TO REPAIR = 1; IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT BUILDING ENTRANCE DOOR , 1st STORY
SPRINKLER WORK IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.THE SIDEWALK SHED AT ADAM CLAYTON POWELL BLVD IN FRONT OF THE BUILDING.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.THE SIDEWALK SHED AR ADAM CLAYTON POWELL BOULEVARD IN FRONT OF THE BUILDING.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.THE SIDEWALK SHED AT ADAM CLAYTON POWELL BLVD IN FRONT OF THE BUILDING.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED IS AT ADAM CLAYTON POWELL BLVD IN FRONT OF THE BUILDING.
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE CEILING IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
APARTMENT ONLY
POWER OUTAGE
CEILING
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING THROUGHOUT: INSTALLATION OF NEW AIR-CONDITIONING SYSTEMS, VENTILATION SYSTEMS AND MISCELLANCEOUS HVAC WORK; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
Self Service
DOOR
STAIRS
WALL
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT BUILDING FRONT ENTRANCE DOOR , 1st STORY
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 0, WG TO REPLACE = 0, WG TO REPAIR = 1 IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT BUILDING FRONT ENTRANCE DOOR , 1st STORY
§ 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE UPPER SASH FIRST WINDOW FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIFTING SLOPING FLOOR IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING THROUGHOUT: INSTALLATION OF NEW AIR-CONDITIONING SYSTEMS, VENTILATION SYSTEMS AND MISCELLANCEOUS HVAC WORK; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, NORTH, EAST AND SOUTH WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
INSTALL HOIST IN ORDER TO PERFORM EXTERIOR FACADE REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
INSTALL HOIST IN ORDER TO PERFORM EXTERIOR FACADE REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
INSTALL HOIST IN ORDER TO PERFORM EXTERIOR FACADE REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
INSTALL HOIST IN ORDER TO PERFORM EXTERIOR FACADE REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING THROUGHOUT:INSTALLATION OF NEW AIR-CONDITIONING SYSTEMS, VENTILATION SYSTEMS AND MISCELLANCEOUS HVAC WORK; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING THROUGHOUT:INSTALLATION OF NEW AIR-CONDITIONING SYSTEMS, VENTILATION SYSTEMS AND MISCELLANCEOUS HVAC WORK; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
BOILER WORK IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
BOILER INSTALLATION FILED IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING THROUGHOUT; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
IPLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY
DOOR
INTERIOR RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FXITURES ON EXISTING ROUGH-IN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INTERIOR WORK OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FXITURES ON EXISTING ROUGH-IN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PLUMBING WORK AT CELLAR FILED IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW BOOSTER PUMP AND HOT WATER HEATERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF KITCHEN AND BATHROOM THROUGHOUT, REPLACE OF CASEWORK, COUNTERS AND CABINETS; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
INTERIOR RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF KITCHEN AND BATHROOM THROUGHOUT, REPLACE OF CASEWORK, COUNTERS AND CABINETS; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
INTERIOR RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF KITCHEN AND BATHROOM THROUGHOUT, REPLACE OF CASEWORK, COUNTERS AND CABINETS; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
INTERIOR RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INTERIOR RENOVATION OF KITCHEN AND BATHROOM THROUGHOUT, REPLACE OF CASEWORK, COUNTERS AND CABINETS; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.