245 EAST 72 STREET, Manhattan, NY, 10021 · New York City · 27 total events
0 infested unit(s) reported
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
SELECTIVE LINTEL & SILL REPLACEMENT, PRECAST COATING REFURBISHMENT, MASONRY REPOINTING, SELECTIVE FACE BRICK REPLACEMENT, NATURAL STONE PATCHING/CRACK REPAIR, SELECTIVE NATURAL STONE REPLACEMENT, MASONRY PROBES, ETC NO CHANGE IN USE EGRESS OR OCCUPANCY.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
installation of pipe scaffolding. no change in use, occupancy or egress under this application. all work to comply with chapter 33 of nycbc
PLUMBING SCOPE OF WORK FOR ALTERATION APPLICATION M01107488-I1. MASTER BATHROOM TO BE RENOVATED. NEW KITCHEN TO BE ADDED.
INTERIOR ALTERATION OF A TWO BEDROOM APARTMENT. KITCHEN TO BE INSTALLED AND BATHROOM TO BE RENOVATION. INTERIOR SCOPE OF THE CHANGE OF USE FILED UNDER M01143112-I1.
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT PHA, 21st STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES AT CEILING IN THE FOYER LOCATED AT APT PHA, 21st STORY, 1st APARTMENT FROM SOUTH AT WEST
Filing herewith for the modifications to existing plumbing system
Filing herewith for the combination of apartments 5B & 5C. AS PER TPPN 3-97. There is no change to use, egress, or occupancy.
Plumbing work in conjunction with combination of apartments 20A and 20F on 19th floor. Remove kitchen in apartment 20F. Replace fixtures in bathrooms. New and relocated fixtures in kitchen and laundry areas.
INTERIOR PLUMBING WORK IN EXISTING APARTMENT 16EF. NO CHANGE IN USE, EGRERSS, OR OCCUPANCY.
INTERIOR ALTERATION OF AN EXISTING THREE-BEDROOM APARTMENT. PARTITIONS TO BE RELOCATED AND BATHROOMS AND KITCHEN TO BE RENOVATED. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
INSTALLATION OF PIPE SCAFFOLDING AS PER PLAN AND IN ACCORDANCE WITH CHAPTER 33 OF NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY
INSTALLATION OF NEW SPRINKLER HEADS TAKEN OFF EXST. WET STANDPIPE FOR NEW TENANT'S RECREATION AND LAUNDRY ROOM AT CELLAR. GENERAL CONSTRUCTION FOR TENANT'S REC RM IS FILED UNDER DOBNOW #M00558627. TENANT LAUNDRY RM IS FILED UNDER DOBNOW #M00454569
INSTALLATION OF NEW SPRINKLER HEADS TAKEN OFF EXST. WET STANDPIPE FOR NEW TENANT'S RECREATION AND LAUNDRY ROOM AT CELLAR. GENERAL CONSTRUCTION FOR TENANT'S REC RM IS FILED UNDER DOBNOW #M00558627. TENANT LAUNDRY RM IS FILED UNDER DOBNOW #M00454569
Remove window AC units. Install new air handlers and condenser unit. Replace or relocate steam radiators.
4A: INSTALLATION OF MECHANICAL UNITS AS PER PLANS FILED HEREWITH,
Apt 4A: Renovations consisting of partitions and finishes including window replacement as per plans filed herewith.
INSTALLATION OF WASHER & DRYERS AND ASSOCIATED WATER, SANITARY, & GAS PIPING FOR ACCESSORY USE BY BUILDING TENANTS AT CELLAR LEVEL. SPRINKLER WORK TO BE PERFORMED UNDER DOBNOW #M00573381. WORK ALSO INCLUDES REPLACEMENT OF EXISTING WATER CLOSET AND LAV
LAUNDRY ROOM REPAIRS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
INTERIOR MECHANICAL WORK IN EXISTING APARTMENT 16EF. NO CHANGE IN USE, EGRERSS, OR OCCUPANCY.
INTERIOR RENOVATION OF APARTMENT 18# A AS PER PLANS SUBMITTED.- PLUMBING . MECHANICAL TO BE FILED IN DOB NOW BUILD. OT APPROVED UNDER DOB BIS#140921849 .NO CHANGE TO USE , EGRESS OR OCCUPANCY.
Installation of Sidewalk Shed as per plans.
Judgment: NO