239 PARK AVENUE SOUTH, Manhattan, NY, 10003 · New York City · 15 total events
0 infested unit(s) reported
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Proposed installation of plumbing fixtures for a new men's toilet. No change to use, occupancy or egress under this application.
AT&T - Relocate existing antenna sector to new frame on roof. Replace existing antennas; install, remove, and replace RRH units on roof. Replace stairs for ladders on platform. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
facade repairs as per plans filed herewith. no change to use, egress or occupancy.
Proposed filing of Mechanical work in conjunction with ALT.2 job #140991782, as per plans.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Proposed Plumbing Work filed in conjunction with ALT. 2 job #140991782, as per plans.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
AT&T - Replacement of existing antennas with installation of RRH units on roof. Retrofit of cabinet in existing equipment shelter on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
MODIFICATION TO EXISTING AT&T SITE. INSTALL (3) ION-M23 SDARS (RRH) WITH RELATED EQUIPMENT ON ROOF. ALL IN CONFORMANCE WITH TPPN 5/98. NO CHANGE INUSE, EGRESS OR OCCUPANCY.
AT&T - Installation of additional telecommunication antennas on the roof. Installation of a new cabinet and retrofit existing cabinet in the equipment platform on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.
AT&T WIRELESS. Replacement of existing telecommunications antennas with installation/replacement of RRH units on roof. Installation of new cabinet and retrofit of existing cabinet in existing equipment shelter on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Judgment: NO