STEEL REINFORCEMENT OF A STEEL COLUMN
Filing herewith for modifications to existing plumbing systems.
FILING HEREWITH FOR THE INTERIOR RENOVATION. PARTITION CHANGES TO NON-LOADBEARING INTERIOR WALLS, GENERAL CONSTRUCTION, AND PLUMBING AS PERPLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO EXTERIOR BUILDINGENCLOSURE OR STRUCTURAL MODIFICATION
RENOVATION OF KITCHEN & RELOCATION OF (2) BATHROOMS. RELOCATION OF WASHER/DRYER.
INSTALLATION OF SPLIT AIR CONDITIONING SYSTEM AND BATHROOM EXHAUST FANS
MINOR LAYOUT MODIFICATIONS. RENOVATION OF KITCHEN & RELOCATION OF (2) BATHROOMS. INSTALL OF NEW FRENCH DOORS AND TRIPLE WINDOWS W/ NEW STEEL LINTELS. REPLACEMENT OF WINDOWS W/LOWERED SILL. MINOR MODIFICATIONS TO MECH, ELEC, LIGHTING, MILLWORK & FINISHES.
CONVERT POWDER ROOM TO LAUNDRY ROOM, INSTALL NEW SUSPENDED CEILING AND REPLACE RANGE HOOD AT KITCHEN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
REPLACE LAVATORY, REMOVE TUB AND TOILET, ADD AUTOMATIC CLOTHES WASHING MACHINE PER PLAN. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Interior alteration to Unit 10c with partial window replacement and two window opening modifications. Addition of some louvers to the facade.
Installation of new two (2) split system air conditioning, kitchen exhaust, toilet exhaust, and outside air system. Replacement of steam heating radiators.
Installation of suspended scaffold, during facade inspection/ repair.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Rigging for Industrial Rope access
Plumbing work in conjunction with new tenant fit-out.
PL Portion of renovation of first floor office, including bathroom. No change to use egress or occupancy on this application.
MH portion of renovation of first floor office, including bathroom. No change to use egress or occupancy on this application.
GC portion of renovation of first floor office, including bathroom. No change to use egress or occupancy on this application.
FILING FOR INTERIOR RENOVATION FOR APARTMENT 16C, WORK INCLUDES REMOVAL OF NON-STRUCTURAL INTERIOR WALLS, REPAIRING AND REPLACING INTERIOR FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
PLUMBING WORK IN CONJUNTION WITH INTERIOR RENOVATION FOR APARTMENT 16C, WORK INCLUDES REMOVAL OF NON-STRUCTURAL INTERIOR WALLS, REPAIRING AND REPLACING INTERIOR FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
PLUMBING MODIFICATIONS WITHIN APT 9-A. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of temporary construction fence submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Facade repair and repair of the side yard stairs as per plans filed. No change in use, egress or occupancy.
INSTALLATION SPLIT SYSTEM AND RELATED DUCT WORK IN UNIT#1BW AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS OF OCCUPANCY.
INTERIOR RENOVATION OF EXISTING BATHROOM AND INSTALLATION OF NEW PANTRY WITH SINK
ADDITION OF NEW FAN OIL UNIT & CONDENSING UNIT AS SHOWN ON PLANS. NO CHANGE I USE, OCCUPANCY OR MEANS OF EGRESS.
Exterior restoration including masonry repair, terracotta repairs and limestone repairs as per plans filed. No change in use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Application being filed to show the installation,relocation, and replacement of gas and plumbing fixtures. No change in use, egress, or occupancy.,
Application being filed to show interior renovation of apartment 15C on the 15th floor. Work includes removal of non-load bearing partitions, renovation of kitchen and bath and plumbing work. No exterior work. No change in use, egress or occupancy.
INSTALLATION OF SPLIT SYSTEM AC SYSTEM AND ASSOCIATED DUCTWORK
MINOR PARTITION WORK WITHIN APT 9-A. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
REPLACE/RELOCATE 3LAV, 3 WC, 1 TUB, 2 SHOWERS, 1 KS, 1DW, 1 WASHER AND 1 GAS STOVE
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.