2354 2 AVENUE, Manhattan, NY, 10035 · New York City · 33 total events
APARTMENT ONLY
Installation of new automatic combined class 1 standpipe and sprinkler system for new building.
Installation of new automatic combined class 1 standpipe and sprinkler system for new building.
Herewith filing for installation of fuel oil storage, fuel oil piping, ventilation and related work as indicated on plans in conjunction with 6 story school new building.
HEREWITH FILING FOR STRUCTURAL WORK ASSOCIATED WITH NEW BUILDING.
HEREWITH FILING FOR NEW 6 STORY SCHOOL BUILDING.
Herewith filing for new curb cut on River Avenue in conjunction with NB #X00706080-I1.
Installation of 330 Gallon fuel oil tank on roof under generator. Note this work and plan were initially approved under subsequent #X00706080-Z2 for fuel oil storage, associated piping and ventilation. Rooftop tank was not captured under Z2 equipment.
CONSTRUCTION FENCE FILED IN CONJUNCTYION WITH NEW BUILDING. ALL AS PER PLANS FILED HEREWITH.
Herewith filing for installation of mechanical systems and duct work in association with new building including installation of commercial cooking and exhaust system located in cellar.
NON-ILLUMINATED NON-ADVERTISING ACCESSORY SIGN FOR A SCHOOL - SUCCESS ACADEMY. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
NON-ILLUMINATED NON-ADVERTISING ACCESSORY SIGN FOR A SCHOOL - SUCCESS ACADEMY. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TROLLEY BEAM SCAFFOLD & BULKHEAD SCAFFOLD AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Herewith filing for plumbing work associated with proposed new building.
Suspended Scaffold For Facade repair as shown on plans
Installation of temporary scaffold construction equipment as per plans filed herewith.
Herewith filing for civil (plumbing) work as indicated on plans.
EQUIPMENT USE: DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY.
SUSPENDED SCAFFOLDING FOR FACADE RESTORATION AS SHOWN ON PLANS
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Temporary fire standpipe system as per plans.
HEREWITH FILING FOR SUPPORT OF EXCAVATION ASSOCIATED WITH NEW BUILDING.
HEREWITH FILING FOR FOUNDATION WORK ASSOCIATED WITH NEW BUILDING.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY HORIZANTAL NETTING AT 6TH FLOOR AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
INSTALLATION OF SYSTEM SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Proposed construction fence. No change to use, egress or occupancy under this application.
PROPOSED TO CAP AND REMOVE SPRINKLER SYSTEM IN CONJUNCTION WITH FULL DEMO JOB # 220745022. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
ENTIRE BUILDING
MECHANICAL MEANS SUBMITTED FOR USE OF MECHANICAL EQUIPMENT AT THE TIME OF DEMOLITION
Herewith filing for index pile program (Test Piles) related to foundation and NB application.
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.