2327 2 AVENUE, Manhattan, NY, 10035 · New York City · 25 total events
Subsequent filing for exhaust hood, fan and related ductwork in commercial kitchen on the 1st floor.
Cooking equipment and plumbing fixtures installation in a burger shop as per the plans filed herewith. No change to the use, egress or occupancy.
Interior built-out for a burger shop as per the plans filed herewith. No change to the use, egress or occupancy.
PLUMBING WORK FILED AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
INTERIOR RENOVATION OF A COMMERCIAL SPACE WITH THE INSTALLATION OF A NEW COMMERCIAL KITCHEN, FULL & PARTIAL HEIGHT PARTITIONS, AND PLUMBING WORK AS PER PLAN. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
INTERIOR RENOVATION OF A COMMERCIAL SPACE WITH THE INSTALLATION OF A NEW COMMERCIAL KITCHEN, FULL & PARTIAL HEIGHT PARTITIONS, AND PLUMBING WORK AS PER PLAN. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
FILE TO PLUMBING WORK AS PER PLAN, CONJUNCTION GC APPLICATION X01015959. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF MECHANICAL SYSTEMS.
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS,OR OCCUPANCY.
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS,OR OCCUPANCY.
ERECT AN ILLUMINATED BUSINESS ACCESSORY BLADE SIGN. NO CHANGE IN USE, EGRESS,OR OCCUPANCY.
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS,OR OCCUPANCY.
KRISPY KREME-REMOVAL AND INSTALLATION OF PLUMBING FIXTURES FOR RETAIL RENOVATION.
ERECT PLYWOOD CONSTRUCTION FENCE THREE FEET FROM PROPERTY LINE AS PER PLAN FILED.
KRISPY KREME-STRUCTURAL FOR RAISED FLOOR FRAMING, SLAB IN-FILL, WATER HEATER AND SECURITY GRILLE SUPPORT IN CONJUNCTION WITH RETAIL RENOVATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
KRISPY KREME-GENERAL CONSTRUCTION INCLUSIVE OF MODIFICATIONS TO INTERIOR PARTITIONS, STOREFRONT REPLACEMENT, FIXTURES AND FINISHES INSTALLATION. CONSTRUCTION FENCE FILED UNDER X00533845-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANY
KRISPY KREME- MECHANICAL EQUIPMENT INSTALLATIONS:CU/FCU WITH RELATED PIPING AND DUCT WORK.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
INSTALLATION OF PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE,OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Removal of concrete finish topping and mezzanine
Removals of interior non-bearing walls, doors & hardware, ceilings & light fixtures. Removal of mezzanine structure, refer to structural drawings. New temp lighting. No change in use, egress or occupancy.
INSTALLATION OF SIDEWALK SHED AS PER PLANS.SIDEWALK SHED LIVE LOAD WILL BE 300 PSF, SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
HEREBY FILING FOR INSTALLATION OF 2(TWO) NEW PACKAGED SPLIT SYSTEM (10 TONS AND 15 TONS) AIR COOLED AIR CONDITIONING UNITS TO PROVIDE AIR CONDITIONING AND VENTILATION OF NEW SPACE IN AN EXISTING BUILDING. NO CHANGES IN USE EGRESS OR OCCUPANCY
INSTALL ILLUMINATED SIGN ON WALL (POPULAR BANK)
INSTALL ILLUMINATED WALL SIGN ON WALL (POPULAR COMMUNITY BANK)