PROPOSED GARAGE REPAIRS AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
PROPOSED GARAGE REPAIRS AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Inspect site conditions for telecom upgrade.
Interior renovation at existing apartment 5KL to install partitions for additional bedroom. No change in use, occupancy and egress.
Converting a portion of the existing living room into a bedroom
INSTALLATION NON BEARING PARTITIONS REPLACEMENT KITCHEN CABINETS, INTERIOR DOORS, RE-TILING BATHROOM FLOOR, WALLS,
Work includes per the filed plans replacement of roof membrane and flashing, guardrails, penthouse storefront entrance, and roof drains.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
Dish - Installation of new telecommunication antenna sectors, GPS antenna, and equipment cabinet on the roof. Installation of conduits and service connection room as per plans. All work is in compliance with 5/98. No change in use, egress, and occupancy.
REMOVE APPROXAIMTELY 7 FEET OF INTERIOR DRYWALL PARTITION. PATCH CEILING, WALLS, AND FLOORS TO MATCH EXISTING ADJACENT. PROVIDE NEW PARTITION TO INCLUDE CLOSET AND CONVENIENCE DOOR FROM BEDROOM TO LIVINGROOM.
Herewith filing plans for plumbing work in conjunction with renovations to units: 5C,5R,9D
Remove closet doors. New closet doors, 12 in. dropped arch for new Kitchenette, stackable washer,dryer existing closet, tile & engineered wood flooring over existing, SCMDs, Washer/DW pan w/ Auto water sensor shutoff. No change to use,egress or occupancy.
Interior alteration to apartment 21B. New partition wall and door as per plans. No change in use, occupancy, or egress.
AT&T - Installation of new donor antenna with installation of related echo repeater on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.
Herewith filing plans for plumbing work in conjunction with renovations to units: 2F,2H,7C.
Units: 2F,2H,7C: Remove non-load bearing wall, closet doors, finishes. New laundry closet, single or double closet doors, tiling and engineered wood flooring (over existing flooring), kitchen and bath finishes, paint, SCMD's. No change to U.E.O.
Herewith filing plans for plumbing work in relation to renovation in units: 1G,10D,19B.
Renovate Units: 1G,10D,19B. Remove non-load walls closet door(s), finishes, appliances. New: Partitions, single or double closet doors, tile and/or engineered wood flooring (over existing flooring), kitchen & bath finishes, paint, SCMD's. No change to UEO
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 10TH FLOOR (APT 10B) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Renovate Units: 2K,5A,20B. Remove non-load walls closet door(s), finishes, appliances. New: Partitions, single or double closet doors, tile and/or engineered wood flooring (over existing flooring), kitchen & bath finishes, paint, SCMD's. No change to UEO.
Herewith filing plans for plumbing work in relation to renovation in units: 2K,5A,20B.
INSTALL MEDIUM DUTY SCAFFOLDING AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Plumbing work in conjunction with apartment renovation. Work includes removal of existing plumbing fixtures, cap/removal, replacement and installation of new fixtures as shown on plans.
MODIFICATION TO AT&T SITE. REPLACE (4) ANTENNAS,REPLACE (1)CABINET AND INSTALL (2) RRH UNITS. ALL IN CONFORMANCE WITH TPPN 5/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Herewith filing plumbing work in units 3A,7P related to the installation of a stackable washer/electric dryer. Job filed in conjunction with BIS A2 Job #140924757
Herewith filing plans for related plumbing for renovation in units: 1A,3D,10R,14C,14T,21B. No change to use,egress, or occupancy.
FILING RELATED PLUMBING WORK PER PLANS FOR RENOVATION IN UNIT 4D. NO CHANGE TO USE, EGRESS , OR OCCUPANCY (EXITS)
Remove existing 10 ton cooling unit for elevator machine rm on the roof. Installation of new 10 ton cooling split system w/2 indoor units located within elevator machine rm & 2 outdoor units located outside on roof. No change to Use,Egress or Occupancy.
DIRECT REPLACEMENT OF (4) CONDENSER UNITS AT OSP (COURTYARD). NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
AT&T - Installation/replacement of RRH units on roof. Removal, installation and retrofit of cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.