225 CENTRAL PARK WEST, Manhattan, NY, 10024 · New York City · 76 total events
MH WORK IN APT 1101, 1102 AND 1102A FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
ENTIRE BUILDING
COMBINATION OF APTS FILED UNDER TPPN 3/97 IN CONJUNCTION WITH DOB NOW PL AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
MOLD
APARTMENT ONLY
0 infested unit(s) reported
JANITOR/SUPER
PLUMBING WITH THE RENOVATION & COMBINATION OF APARTMENTS #1120 AND #1120A ON THE 11TH FLOOR. AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
GENERAL CONSTRUCTION ARCHITECTURAL FOR THE RENOVATION & COMBINATION OF APARTMENTS #1120 AND #1120A ON THE 11TH FLOOR. AS PER PLANS FILED HEREWITH. PER TPPN #3/97. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
ENTIRE BUILDING
APARTMENT ONLY
NEW PLUMBING WORK APT #423. IN CONJUNCTION WITH # M01101413
INTERIOR RENOVATION OF APT. #423. NEW OPENINGS IN EXTERIOR MASONRY WALL FOR NEW A/C UNITS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
PLUMBING FIXTURES FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
INTERIOR RENOVATION IN APT 704 FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
Work to 5 bathrooms: Replacing fixtures and relocating fixtures; Removing a bathroom; Relocating a gas range after the apartment shut-off valve; Relocating the kitchen sink
ENTIRE BUILDING
General construction work associated with the renovation of an existing 17th floor apartment including reconfiguration of plumbing fixtures, partitions, and fenestrations.
Interior Alteration to Apartment unit 818
HVAC Upgrades to Apartment #1704 on 17th Floor
REMOVAL OF THE EXISTING SLAB AT THE 15th FLOOR IN THE UNIT BEING RENOVATED., INSTALLATION OF A NEW DECK AT THE 15th FLOOR WITH A NEW OPENING INSTALLED, INSTALLATION OF A NEW COMMUNICATION STAIR BETWEEN THE 14th FLOOR AND THE15th FLOOR THE COMBINED UNIT
Modify plumbing fixtures in kitchen and bathroom in 10th floor apartment as per plans. No change in use, egress, or occupancy under this application.
Replace existing radiator with new PTAC unit at 10th floor apartment. No change in use, egress, or occupancy under this application.
Filing interior renovation includes partition, floor, door, and finish work at 10th floor apartment as per plans. No change in use, egress, or occupancy under this application.
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
THREE NON-ILLUMINATED NON-ADVERTISING RESIDENTIAL RETRACTABLE AWNINGS FOR APT. 1704. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
INSTALLATION OF 600# to 1000# CAPACITY MATERIAL ONLY HOIST AS PER DRAWINGS. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
MECHANICAL FOR THE RENOVATION OF APARTMENTS #1701/1702 ON THE PENTHOUSE, UPPER PENTHOUSE, AND ROOF. AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Installation of Emergency sidewalk shed as per AC -28-105.4.1 per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Facade restoration as per plans filed herewith. No change in use, egress or occupancy.
ENTIRE BUILDING
Minor interior renovation job: 1. replacing all light fixtures. 2. renovate three bathrooms. 3. relocate a washer/dryer closet. 4. refinish the floor.
New Alt2 application for plumbing work to be performed in existing unit #901/902A/922/923 on the 9th fl. All in accordance with submitted plans. No change to use, egress or occupancy under this application.
New Alt2 application for general construction work to be performed in existing unit #901/902A/922/923 on the 9th fl. Sub plumbing application to be filed. All in accordance with submitted plans. No change to use, egress or occupancy under this application
Plumbing work for the renovation of the 14th and 15th floors, roof and bulkhead roof. Removal of existing gas range. cut and connect domestic piping and sanitary/vent to proposed fixtures. No change to use egress or occupancy..
APARTMENT ONLY
Plumbing upgrades to apartment #1704
APARTMENT ONLY
PLUMBING IN CONJUNCTION WITH THE RENOVATION & COMBINATION OF APARTMENTS #1701 AND #1702 ON THE PENTHOUSE. AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
GENERAL CONSTRUCTION ARCHITECTURAL FOR THE RENOVATION & COMBINATION OF APARTMENTS #1701 AND #1702 ON THE PENTHOUSE & UPPER PENTHOUSE. AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
ENCLOSURE OF SECONDARY DOORWAY # 902 WITH 2-HR RATED FIRE PARTITION.
Application filed to replace window on east facade, 15th floor partial demolition of existing floor slab. Full interior renovation with new stairs. No change to occupancy or egress in this application.