225 2 AVENUE, Manhattan, NY, 10003 · New York City · 30 total events
Erect new building
ADDITION OF A PORTION OF GOLDFINE PAVILION GROUND FLOORTO STOLZ PAVILION'S CERTIFICATION OF OCCUPANCY. THE SPECIFIED AREA OF GOLDFINE IS NOTSUBJECT TO CHANGE OF USE OR OCCUPANCY. GOLDFINE PAVILION DEMOLITION TO BE FILEDUNDER SEPARATE APPLICATION.
RECONNECTION OF EXISTING HOT WATER RADIATORS FROM THE GOLDFINE PAVILION TO HEATING HOTWATER PIPING IN THE JACOB REINGOLD PAVILION. CAPPING OF DUCTWORK THAT EXTENDS TO THE AREA OFDEMOLITION AND REBALANCING DIFFUSERS FROM AHU-6 IN THE JACOB REINGOLD PAVILIO
Installation of antennas and associated equipment -AT&T as per plans. No change to use, egress or occupancy.
Filing for structural work for LL 11 as per plans filed herewith.
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION OVER SKYLIGHT AS PER PLANS. OVERHEAD PROTECTION SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Plumbing work at 2nd floor including removal of existing plumbing fixtures, modifying existing and providing new piping for new plumbing fixtures in revised resident bathrooms. Application filed in conjunction with GC X00888164-I1 and MS X00888164-S1
sprinkler work as shown on drawings filed herewith.
INTERIOR RENOVATION OF 2ND FLOOR, RESNICK PAVILION, AS SHOWN PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Mechanical work in conjunction with interior renovation of the 2nd floor of Resnick Pavilion. Scope of work includes the removal and replacement of associated ductwork and piping, exhausts, grilles, diffusers, etc., as shown per plan.
Temporary air pressurized standpipe for new building as shown on drawings filed herewith,
full demolition of 4 story structure using hand and mechanical means to demolish.
Interior non-structural demolition as shown on drawings filed herewith.
Chute will be installed in accordance with approved demolition plans. Mechanical means will be used in accordance with approved demolition plans.
structural shoring in conjunction with full demolition as shown on drawings filed herewith.
ALTERATION-APPLICATION FILED HEREWITH FOR FACADE REPAIR ON VENEER BRICK AND CONCRETE LOCATED ON MECHANICAL ROOF TOPS. NO CHANGE TO OCCUPANCY, USE OR EGRESS.
Plumbing application filed in conjunction with interior renovation of the 2nd floor Stolz Pavilion, work includes the removal and replacement of piping and fixtures, installation of new fixtures, as shown per plan.
Mechanical work in conjunction with the interior renovation of the 2nd Floor Stolz Pavilion. Scope of work to include the removal and replacement of ductwork, supply and exhaust, diffusers, adding one unit heater as per plan.
INTERIOR RENOVATION OF 2ND FLOOR STOLZ PAVILION AS SHOWN PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
plumbing work as shown on drawings filed herewith.
underground plumbing work as shown on drawings filed herewith.
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Installation of temporary chute per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
MODIFY SPRINKLER LAYOUT FOR OFFICE RENOVATION. REMOVE 13 SPRINKLER HEADS AND REINSTALL 12 SPRINKLER HEADS WITH ASSOCIATED PIPING.
REMOVE EXISTING BRANCH DUCT WORK AND INSTALL NEW BRANCH DUCT DUCT WORK IN RENOVATED OFFICE SPACES.. REPLACE FAN COIL UNITS AND INSTALL EXHAUST FAN.
ADD LAVATORY AND PANTRY IN OFFICE SPACE ADDING WATER CLOSET, LAVATORY AND SINK WITH ASSOCIATED PIPING.
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019