2231 1 AVENUE, Manhattan, NY, 10029 · New York City · 14 total events
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MINOR INTERIOR SCOPE OF WORK ON 2ND FLOOR. THE SCOPE OF WORK ON 2ND FLOOR INCLUDES CRAC REPLACEMENT IN PHASES. NO CHANGE IN EGRESS OR OCCUPANCY. EXISTING BUILDING CORE AND SHELLSPACES TO REMAIN.
Facade restoration project to include masonry, pointing, sills, lintels, wall tie installation, concrete patching, scrape, prime, and paint exposed steel.
Installation of suspended scaffold for facade work or inspection
New antenna installation. Install cabinets on metal platform. Related (3) new sectors of antennas on the roof. (3 antennas, 6 RRU's and 1 GPS antenna) All work is in conformance with TPPN#5/98. No change in use, egress, or occupancy. Carrier DISH.
Administrative filing for the issuance of Certificates of Compliance for mechanical equipment already installed under MH job #M00295976-I1.
Sprint - Decommission of existing telecommunication site. Removal of antenna sectors, dunnage platform with related cabinets and associated cabling/conduits from roof to cellar. No change in use, egress, or occupancy
ILLUMINATED NON ADVERTISING ACCESSORY REPLACMENT PANEL REPLACING SIGN PERMITTED UNDER APPLICATION #121154776 - INSIDE PROPERTY LINES - CUNY IN THE HEIGHTS
FILING FOR SPRINKLER WORK RELATED TO THE ALT2: INTERIOR DEMO AND INSTALLATION OF NEW PARTITIONS, DOORS AND FINISHES FOR TENANT FIT OUT AT BAS, 1ST & 2ND FLOOR (TENANT'S 1ST THROUGH 3RD FLOOR) & ALT-1 FILING TO CHANGE THE USE AND OCCUPANCY AS PER PLANS.
FILING FOR ST WORK RELATED TO THE ALT2: INTERIOR DEMO AND INSTALLATION OF NEW PARTITIONS, DOORS AND FINISHES FOR TENANT FIT OUT AT BAS, 1ST & 2ND FLOOR (TENANT'S 1ST THROUGH 3RD FLOOR) & ALT-1 FILING TO CHANGE THE USE AND OCCUPANCY AS PER PLANS SUBMITTED.
MECHANICAL WORK RELATED TO THE ALT2: INTERIOR DEMO AND INSTALLATION OF NEW PARTITIONS, DOORS AND FINISHES FOR TENANT FIT OUT AT BAS, 1ST & 2ND FLOOR (TENANT'S 1ST THROUGH 3RD FLOOR) & ALT-1 FILING TO CHANGE THE USE AND OCCUPANCY AS PER PLANS SUBMITTED.
FILING FOR PLUMBING WORK RELATED TO THE ALT2: INTERIOR DEMO AND INSTALLATION OF NEW PARTITIONS, DOORS AND FINISHES FOR TENANT FIT OUT AT BAS, 1ST & 2ND FLOOR (TENANT'S 1ST THROUGH 3RD FLOOR) & ALT-1 FILING TO CHANGE THE USE AND OCCUPANCY AS PER PLANS.
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MODIFICATION TO EXISTING SPRINT SITE. REPLACE 3 EXISTING ANTENNAS & 3 EXISTING CABINETS, REMOVE 3 EXISTING RRH. RELOCATE 1 EXISTING ANTENNA, INSTALL 3 NEW ANTENNAS,, 9 NEW RRH .& 1 NEW CABINET ON ROOF IN CONFORMANCE W/ TPP 5/98 NO CHANGE USE, EGRESS OCCU