INSTALLATION OF PLYWOOD CONSTRUCTION FENCE AS PER PLANS. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
New CMU parapet walls along main roof (559 LF) and bulkhead roof (335 LF) perimeters.
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
EMERGENCY WORK TO DEMOLISH ALL FACADE AREAS OF CONCERN AS PER PLANS IN RESPONSE TO DOB VIOLATION NUMBER 032425CE11201NB
EMERGENCY WORK TO DEMOLISH ALL FACADE AREAS OF CONCERN AS PER PLANS IN RESPONSE TO DOB VIOLATION NUMBER 032425CE11201NB
INSTALLATION OF PIPE SCAFFOLDING PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
FACADE RESTORAITON AS PER PLANS
INSTALLATION OF 300 PSF SIDEWALK SHED AND OVERHEAD PROTECTIONAS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Reroofing as per plans filed herewith. No change in use, egress or occupancy under this application.
New MEP dunnage steel framing & additional steel framing in support of new MEP equipment within existing elevator shaft. Roughly (1150 LF). no change in use, egress or occupancy
Fire rated shaft wall installation. No change in use, egress or occupancy.
Install new electric water heater. no change in use occupancy or egress
New VRF infrastructure installation. no change in use, occupancy or egress.
FACADE REHABILITATION
Modifications to existing HVAC systems. no change in use, egress or occupancy.
Exterior windows, entrance and vestibule doors replacement; Insulation installation; interior partitions, doors, flooring and drop ceiling installations. No change in use, egress or occupancy.
FILING MECHANICAL PLANS FOR INTERIOR NEW CONSTRUCTION WORK ON CELLAR FLOOR. WORK INCLUDES INSTALLATION OF NEW AIR HANDLER WITH CHILLED WATER AND STEAM COILS (TIED INTO EXISTING CHILLER/BOILER) WITHIN EXISTING MECHANICAL ROOM.
WATERPROOFING OFF FOUNDATION WALL AND SHORING DURING EXCAVATION AS PER PLANS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF ALL NEW PLUMBING FIXTURES IN CELLAR, TIED INTO EXISTING RISERS AND UNDERGROUND WASTE LINES.
PROPOSED INSTALLATION OF TEMPORARY FENCE AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
Modifications to existing plumbing system. No change in use egress or occupancy.
FILING FOR INTERIOR FIT OUT AND RELATED FINISHES IN CELLAR. WORK INCLUDES CONSTRUCTION OF NON-BEARING PARTITIONS, FLOORING AND MILLWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
FILING HEREWITH ARCHITECTURAL DRAWINGS FOR INTERIOR DEMOLITION WORK ON CELLAR FLOOR. WORK TO INCLUDE: REMOVAL OF NON-BEARING PARTITIONS, INTERIOR DOORS, FIXTURES AND FLOORING. NO CHANGE IN USE, EGRESS OR OCCUPANCY
FILING HEREWITH MECHANICAL DRAWINGS FOR INTERIOR DEMOLITION WORK ON CELLAR FLOOR. WORK TO INCLUDE: REMOVAL OF AIR HANDLERS, CHILLED WATER AND STEAM COILS WITHIN MECHANICAL ROOM AND ALL AIR DISTRIBUTION AND DUCTWORK WITHIN THE SPACE.
Filing Plumbing drawings for interior demolition work in Cellar - Removal of all plumbing fixtures back to risers and underground