filing herewith plumbing plans in conjunction with alt1 121207880 - all proposed work is exterior to the building and does not propose any building penetrations.
INSTALLATION OF 300 psf SIDEWALK SHED, WORK PLATFORM AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 300 psf SIDEWALK SHED, WORK PLATFORM AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 300 psf SIDEWALK SHED, WORK PLATFORM AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED, PIPE SCAFFOLDING & PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
filing sprinkler plans in conjunction with alt1 121207880
Complete renovation of existing building including replacement of all HVAC systems. Scope of work includes removal of existing boiler and heating system and installation of new gas-fired condensing boiler in cellar mechanical room. In Conj M00343081-I1
mechanical plans in conjunction with alt 1 # 121207880 & Boiler filing M00858496 -- NYPL FORT WASHINGTON
filing plumbing plans in conjunction with alt 1 121207880
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY MATERIAL HOIST AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
PARTIAL DEMOLITION, BRACING/SHORING FOR PARTIAL DEMOLITION RELATED TO APPLICATION M00592643-I1
EQUIPMENT USE FOR PARIAL DEMOLITION OF PROTECTION & MECHANICAL METHODS RELATED TO APPLICATION M00592643-I1. DEBRIS CHUTE SHALL BE FILED UNDER SEPARATE APPLICATION.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED, PIPE SCAFFOLDING & PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
INSTALLATION OF WORKING PLATFORM AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. PLATFORM SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED, PIPE SCAFFOLDING & PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
INSTALLATION OF DEBRIS CHUTE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. DEBRIS CHUTE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.