HP SP: Modifications to HVAC Equipment and ductwork to accommodate alterations for the sprinkler upgrades within the existing hospital building as per plans.
Replace existing air outlets, install new branch supply and return ductwork, and add a new VAV air terminal box.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED IS AT WEST 168T ST AND WEST 168TH ST, MAIN ENTRANCE AND OVER THE EAST MECHANICAL UNITS.
Plumbing and sprinkler modification including RENOVATION OF AN EXISTING SPACE TO A NEW EQUIPMENTREPAIR ROOM WITH NEW SINK AND EYE WASH STATION
INSTALLATION OF MATERIAL ONLY HOIST AS PER DRAWINGS. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF A TEMPORARY FIRE PROTECTION SPRINKLER SYSTEM ON THE 4TH FLOOR AT THE NYP SERVICE BUILDING - GMP 4 AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP.
HP SP: SPRINKLER MODIFICATIONS THROUGHOUT AS INDICATED ON PLANS FILED HEREWITH.
CHNY Ped ED: Sprinkler and Plumbing modifications to accommodate alterations to the Pediatric Emergency Dept. within the existing hospital building. No change to zoning, use, egress or occupancy.
PLUMBING, SPRINKLER & STANDPIPE MODIFICATIONS ON FLOORS 4, 5 & 6 WITH IN THE CHNY BED TOWER TO ACCOMMODATE INTERIOR ALTERATIONS AS PERPLANS FILED HEREWITH ONLY.
CHNY Ped ED: Sprinkler and Plumbing modifications to accommodate alterations to the Pediatric Emergency Dept. within the existing hospital building. No change to zoning, use, egress or occupancy.
ROOF REPLACEMENT Roof #1 (West 20thFloor Roof) and Roof #7 (17thFloor Setback Roof) AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
SB Shops: Modifications of interior partitions and finishes to accommodate alterations on partial basement and 1st floor in the existing hospital related building as per plans filed herewith only.
CHNY Ped ED: Modification of HVAC equipment and ductwork to accommodate alterations to the Pediatric Emergency Dept. within the existing hospital building. No change to zoning, use, egress or occupancy.
CHNY Ped ED: Modifications of interior partitions and finishes to accommodate alterations to the Pediatric Emergency Dept. within the existing hospital building. No change to zoning, use, egress or occupancy.
Plumbing and sprinkler modification including RENOVATION OF AN EXISTING SPACE TO A NEW EQUIPMENTREPAIR ROOM WITH NEW SINK AND EYE WASH STATION
Interior renovation to the Emergency Department on 1st floor to accommodate medical equipment ; minor related work in cellar ceiling; All work as per plans. No change to zoning, egress, occupancy. NYPH Vanderbilt Clinic.
Remove and replace mechanical ductwork and equipment on partial 1st floor to accommodate medical equipment replacement as per plans filed herewith only (Vanderbilt Clinic CT Renovation)
Install new steel framing to accommodate medical equipment on partial 1st floor in the existing emergency department as per plans filed herewith.
This project consists of the removal of decommissioned water equipment in room 4-489B and re-purposing the rooms as a new equipment repair room. Existing decommissioned dialysis boxes in Room PB-04-439 to be removed.
Structural steel framing and concrete to accommodate Central Sterile alterations in the existing hospital related building.
Service Building CSPD: Install new HVAC equipment and ductwork to accommodate Central Sterile department at the hospital as per plans filed herewith.
PARTIAL FACADE REMOVAL IN PREPARATION FOR NEW FACADE INSTALLATION. NEW FACADE INSTALLATION AND ENERGY COMPLIANCE FILED SEPARATELY. THIS APPLICATION EXCLUDES ANY STRUCTURAL DEMOLITION.
SB Shops: Modifications of HVAC equipment and ductwork to accommodate alterations to existing accessory storage and offices on basement and 1st floor as per plans filed herewith only.
CHNY TOWER SP: MODIFICATIONS OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE THE SP UPGRADES WITHIN THE EXISTING CHNY TOWER BUILDING AS INDICATED ON PLANS FILED HEREWITH.
structural and foundation work to accommodate extension of the utility tunnel for MEP piping below grade adjacent to the existing hospital building.
SB Shops: Structural steel framing on partial 1st floor to accommodate new equipment.
8ft high construction fence during excavation
Remove and install new plumbing fixtures and piping including medical gas piping; associated sprinkler work; all work on partial 3rd floor to accommodate the MRI Suite renovation as per plans filed herewith only.
SB Shops: Modifications of sprinkler, standpipe, and plumbing piping and fixtures on cellar, basement and 1st floor in the existing hospital related building as per plans filed herewith only.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD TOP OF THE SIDEWALK SHED PAST THE 17TH FLOOR SETBACK.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED AT WASHINGTON AVENUE AND THE LOAD DOCK.
CHNY Bed Tower LABOR AND DELIVERY:. Plumbing and sprinkler modifications to accommodate the labor and delivery sterile supply refurbishment at the existing hospital building. No change to zoning, use, egress or occupancy.
Remove and install new plumbing piping and fixtures, and replace sprinkler heads and piping on partial 1st floor in the existing Emergency Department to accommodate CT installation as per plans filed herewith only.
PLUMBING, SPRINKLER & STANDPIPE MODIFICATIONS ON FLOORS 4, 5 & 6 WITH IN THE CHNY BED TOWER TO ACCOMMODATE INTERIOR ALTERATIONS AS PERPLANS FILED HEREWITH ONLY.
Structural steel framing and concrete to accommodate Central Sterile alterations in the existing hospital related building.
Annex Removal - PARTIAL DEMOLITION OF THE SERVICE BUILDING TOREMOVE THE ANNEX FROM THE CELLAR THROUGH 2ND FLOOR ROOF. DEMOLITION INCLUDES REMOVALOF ALL MEP SYSTEMS WITHIN ANNEX FOOTPRINT.
Change of use including interior alterations throughout to accommodate Central Sterile department on 2nd and 3rd floors, and maternity hospital uses on floors 4,5, and 6. Remove Annex portion on basement and 1st floors. Obtain an amended CO.
remove and install new plumbing, sprinkler, standpipe piping and equipment and fixtures on floors Cellar, basement, 1-3, 7 and roof to accommodate renovations for the hospital related Central Sterile department.
CHNY 11 UROLOGY: SPRINKLER AND PLUMBING MODIFICATIONS TO ACCOMMODATE ALTERATIONS TO THE UROLOGY SUITE WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS
CHNY T Elevator Lobby: Sprinkler modifications to accommodate the elevator lobby renovations in the existing hospital building. No change to zoning, use, egress or occupancy.
CHNY T Elevator Lobby: Modifications of interior partitions and finishes to accommodate the elevator lobby renovations in the existing hospital building. No change to zoning, use, egress or occupancy.
CHNY T Elevator Lobby: Ductwork and piping modifications to accommodate the elevator lobby renovations in the existing hospital building. No change to zoning, use, egress or occupancy.
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
TEMPORARY CRASH DECK PLATFORM AS PER DRAWINGS. CRASH DECKS PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
STORAGE OF MATERIAL / EQUIPMENT ON TOP OF OVERHEAD PROTECTION. STORAGE SHALL NOT EXCEED 75 PSF. OVH PROTECTION FILED UNDER SEPARATE APPL. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BC.NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
TEMPORARY OVERHEAD PROTECTION DURING BLDG ALTERATION, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
TEMPORARY SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
TEMPORARY SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.