OR6: MODIFICATION OF MEDICAL GAS PIPING CONNECTED TO THE OPERATING ROOM BOOM.
OR-6: Remove and replace existing equipment on partial 4th floor in the existing hospital building for renovation of O.R.#6 as per plans. No change to zoning, use, egress, occupancy.
OR#6 Modification of HVAC equipment and ductwork of CHONY OR6 on partial 4th floor in the existing hospital building as per plans. No change to zoning, use, egress, occupancy.
CHNY NORTH SP: MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE SPRINKLER UPGRADES WITHIN THE EXISITNG BABIES HOSPITAL NORTH BUILDING AS INDICATED ON PLANS FILED HEREWITH.
CHNY SP: Structural modification as indicated on plans filed herewith.
CHNY North EOS X-Ray: Remove and install new plumbing piping and fixtures on 3rd floor in the existing Hospital building as per plans filed herewith only.
CHNY North ENDO: Plumbing and sprinkler modifications to accommodate the endo suite renovation on partial 3rd floor in the existing hospital building as per plans filed herewith.
OR#4 Modification to medical gas piping to accommodate renovation of Operating room 4 partial 4th floor in the existing hospital.
CHNY North ENDO: Plumbing and sprinkler modifications to accommodate the endo suite renovation on partial 3rd floor in the existing hospital building as per plans filed herewith.
CHNY North ENDO: Modifications to hvac ductwork, piping and equipment to accommodate Endoscopy site renovation on partial 3rd floor in the existing hospital.
CHNY North ENDO: Interior alterations to the endoscopy suite on partial 3rd floor in the existing hospital as per plans filed herewith only. No change to zoning, use, egress, or occupancy.
CNHY NORTH ENDO SUITE- Structural work on 3rd floor ceiling (@ 4th floor framing )to accommodate the installation of new medical equipment on the partial 3rd floor in the existing hospital as per plans filed herewith only.
O.R. 4: Remove and replace existing equipment on partial 4th floor in the existing hospital building as per plans. No change to zoning, use, egress, occupancy.
CHNY North EOS X-Ray: Remove and install new plumbing piping and fixtures on 3rd floor in the existing Hospital building as per plans filed herewith only.
CHNY North EOS X-Ray: 3rd floor alterations within the hospital to accommodate x-ray upgrade as per plans filed herewith.
CHNY North EOS X-Ray: renovate existing EOS X-ray scan room, replace air outlets with new. Provide new ductwork and hot water reheat coil. All work as per plans filed herewith.
OR#4: Modification of HVAC equipment and ductwork of CHONY OR4 on partial 4th floor in the existing hospital building as per plans. No change to zoning, use, egress, occupancy.
OR#4 New steel framing to support medical equipment on 4th floor in the existing hospital.
CHNY NORTH SP: SPRINKLER MODIFICATIONS THROUGOUT THE EXISTING CHNY NORTH BUILDING AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
OR#2. Modification to medical gas piping to accommodate renovation to Operating Room #2 on partial 4th floor in the existing hospital.
OR#2 - Structural work to accommodate the installation of new medical equipment in the existing hospital only.
OR#2. Renovation of Operating Room # 2 on partial 4th floor in the existing hospital building as per plans. No change to zoning, use, egress, occupancy.
OR#2 Minor Mechanical work to accommodate the renovation of OR 2 on partial 4th floor of the existing hospital as per plans filed herewith.
BHN PEDS: Sprinkler and plumbing modifications to accommodate alterations to the pediatric behavioral program with in the existing hospital building as per plans. No change to use, egress or occupancy.
BHN PEDS: Modification of HVAC equipment and ductwork to accommodate alterations to the pediatric behavioral program with in the existing hospital building as per plans. no change to use, egress or occupancy.
BHN PEDS: Modification of interior partitions and finishes to accommodate alterations to the pediatric behavioral program with in the existing hospital building as per plans. no change to use, egress or occupancy
BHN RAD ONC:
BHN PEDS: Sprinkler and plumbing modifications to accommodate alterations to the pediatric behavioral program with in the existing hospital building as per plans. No change to use, egress or occupancy.
PLUMBING, SPRINKLER AND STANDPIPE PIPING MODIFICATIONS TO ACCOMMODATE THE LINAC REPLACEMENT PROJECT AS PER PLANS
PLUMBING, SPRINKLER AND STANDPIPE PIPING MODIFICATIONS TO ACCOMMODATE THE LINAC REPLACEMENT PROJECT AS PER PLANS
BHN RAD ONC: Modifications of interior partition and finishes to accommodate alterations to the Rad Onc suite within the existing hospital building as per plans
BHN RAD ONC:
BHN RAD ONC:
PLUMBING, SPRINKLER AND STANDPIPE PIPING MODIFICATIONS TO ACCOMMODATE THE LINAC REPLACEMENT PROJECT AS PER PLANS
HVAC modifications to accommodate alterations for the LINAC replacement within the existing hospital building.