205 WEST END AVENUE, Manhattan, NY, 10023 · New York City · 76 total events
§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 28T UPPER LEVEL, 28th STORY, 2nd APARTMENT FROM WEST AT NORTH
ENTIRE BUILDING
ENTIRE BUILDING
INSTALL SPLIT SYSTEM AIR CONDITIONING UNITS.
0 infested unit(s) reported
COMBINATION AND RENOVATION OF EXISTING NON ADA COMPLIANT APARTMENTS15E AND 15F INCLUDING MINOR LAYOUT CHANGES. NO CHANGE IN USE, EGRESSAND/OR OCCUPANCY.
COMBINATION APARTMENTS 15E AND 15F IN ACCORDANCE TO TPPN03/97, INCLUDING MINOR LAYOUT CHANGES, ELECTRICAL, LIGHTING AND PLUMBING WORK. NO CHANGE IN USE, EGRESSAND/OR OCCUPANCY.
FILING FOR COMBINATION OF CO-OP APT. 29R&29P ON 29TH FLR. WORK INCLUDES REMOVAL OF NON-STRUCTURAL INTERIOR WALLS. CHANGES TO LAYOUT OF KITCHEN. RELOCATING PLUMBING FIXTURES. REPAIRING & REPLACING INTERIOR FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INSTALLATION OF NEW HVAC SYSTEM INCLUDING THRU-WALL CONDENSERS AND AIR HANDLERS WITH REQUIRED DUCTWORK, GRILLES AND CONTROLS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INSTALLATION AND USE OF SUSPENDED SCAFFOLD FOR FACADE RESTORATION/ INSPECTION AS PER PLANS SUBMITTED
Plumbing modifications as shown on plans in conjunction with Combination of Apartments 19W and 20W on the 18th and19th Architectural Floors / 19th and 20th Marketing Floors. Application filed as per TPPN #3/97. No change in Use, Egress or Occupancy.
ALT 2. PLUMBING FOR UPGRADED BATHROOM. NEW SINK, TOILET & SHOWER. REMOVE KITCHEN. NEW WASHER?DRYER AND REPLACED SINK.
ALT TYPE 2 TO COMBINE APT 10D & 10E. REMOVE KITCHEN AT 10E AND NEW LAUNDRY ROOM. UPGRADE ONE EXISTING BATHROOM. REMOVE TUB AND NEW SHOWER, REPLACED TOILET AND VANITY. NEW WOOKD FLOOR NEW FRAMING AND DOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Combination of apartments 19W and 20W on the 18th and 19th Architectural Floors / 19th and 20th Marketing Floors. Application filed as per TPPN #3/97. Interior non-structural partitions, finishes as shown on plans. No change in Use, Egress or Occupancy.
PROPOSED COMBINATION OF UNITS 27 P-M-N. THE KITCHEN IN 27P WILL BE DECOMISSIONED. THE EXISTING KITCHEN IN 27 M/N WILL BE RELOCATED TO A PREVIOUS LOCATION.
Renovation and combination of apartments 27M/N and 27P. Plumbing filed under subsequent filing M01173519-S1. No change to use. egress, or occupancy. Also filing to superseding application number 101891124
COMBINATION OF APTS FILED UNDER TPPN 3/97 IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
REPLACE (2) WATER CLOSETS, (2) SHOWERS, (2) LAVATORIES, (1) SINK. RELOCATE (1) DISHWASHER, (1) SINK, (1) REFRIGERATOR. NEW (1) WASHER, (3) FUNNEL DRAINS. REMOVE (1) DISHWASHER, (1) REFRIGERATOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Herewith file plumbing plans to combine Apts, 27R and 27S, filed in conjunction with general construction.
Herewith file plans to combine Apts. 27R and 27S per TPP memo 3/97, - Renovate 27S bath (No work in 27R bath)- Renovate 27R Kitchenette-27S kitchen to become laundry room-modifications to non-structural partitions-upgrade to finishes throughout.
Apt 27E — Possession
New Slab Opening for new Interior Access Stair related to combination of apartments 19W and 20W on the 18th and 19th Architectural Floors / 19th and 20th Marketing Floors. GC under Initial Filing M01042902-I1. No change in Use, Egress or Occupancy
CO 114236 for 101244020 was issued for accessory gym Subsequent CO's issued missed adding this. We are filing to get a Letter of completion for the accessory gym. Used only by building occupants
APPLICATION FILED FOR PLUMBING WORK AS PER PLANS HEREWITH IN. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
APPLICATION FILED FOR INTERIOR RENOVATION AND COMBINATION OF APARTMENT UNIT 16M & 16N AS PER TPPN #3/97. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
DUCTWORK FROM ONE NEW BATHROOM TO EXISTING VENTILATION SHAFT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
DOOR
FLOOR
RADIATOR
BASIN/SINK
APARTMENT ONLY
WINDOW FRAME
RENOVATION OF BATHROOM AND NEW PLUMBING FIXTURES INSTALATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
INTERIOR RENOVATION AND PARTIAL COMBINATION OF TWO APARTMENTS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
GARAGE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
REPLACEMENT OF PLUMBING FIXTURES AND GAS RANGE ON EXISTING PIPING.
MISCELLANEOUS FACADE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filing for the Interior Renovation of Unit 19L as per plans herewith. No Change in Use, Egress or Occupancy.
PROPOSED REMOVAL OF UNSTABLE MASONRY AND INSTALLATION OF EIFS SYSTEM AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NOCHANGE I USE, EGRESS OR OCCUPANCY.
PLUMBING FIXTURES IN APT 11E FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
DOOR
INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AND FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Alterations to existing apartment 5V on the 5th Floor. Minor modifications of interior non-structural partitions demo and installations, finishes as shown on plans. Plumbing Work filed under DOB NOW M00817021-I1. No change in Use, Egress or Occupancy
INTERIOR RENOVATION IN APT 11E FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Alteration Type 2. Install interior partitions in an existing apartment #21A on 21st Floor. No Change in Use, Egress or Occupancy as per plans filed herewith.
ASSOCIATED PLUMBING WORK FOR APARTMENT 25D INTERIOR RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
GENERAL CONSTRUCTION FOR APARTMENT 25D INTERIOR RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use, occupancy, or egress under this application. Sidewalk Shed shall comply with chapter 33 of the 2014 code.
PLUMBING WORK ON APT. 20D ON 20TH FLOOROF THE BUILDING AS PER PLANS ATTACHED HEREWITH.NO CHANGE IN USE, EGRESS AND OCCUPANCY.