2039 3 AVENUE, Manhattan, NY, 10029 · New York City · 13 total events
RADIATOR
Installation of a temporary Sheeting framing support of excavation system as per plans.
Renovation of the BPL Walt Witman Library, architectural plans filed herewith. removal and relocation of elevator tower and egress stair
SCOPE OF WORK INCLUDES NEW SPRINKLERS IN THE CELLAR. NEW SPRINKLER MAIN CONNECTED TO NEW4 COMBINED WATER SERVICE WITH NEW 4 DCDA FOR THE SPRINKLER PORTION OF THE WATER SERVICE.NEW 4x3x3 SIAMESE CONNECTION.
INSTALLATION OF TEMPORARY CONSTRUCTION CHAIN-LINK FENCE OVER PLASTIC YODOCKS AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Civil earthwork filing
structural filing
foundation filing
Complete upgrade of HVAC system.
civil plumbing
plumbing work for bpl
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF