200 WEST 26 STREET, Manhattan, NY, 10001 · New York City · 25 total events
INSTALL EXTERIOR ILLUMINATED WALL SIGN (THE MALIN)
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco
SPRINKLER MODIFICATIONS ON FIRST FLOOR AS SHOWN ON PLANS FILED
PLUMBING MODIFICATIONS ON FIRST FLOOR AS SHOWN ON PLANS FILED
INTERIOR RENOVATION ON FIRST FLOOR AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION
MECHANICAL MODIFICATIONS ON FIRST FLOOR AS SHOWN ON PLANS FILED
Interior renovation of commercial existing retail banking branch. Work includes but is not limited to demolition and construction of non-structural partitions, ceiling, finsihes and furniture/equipement.
Modification of HVAC system as per plans, in conjuction with construction filed under applicaiton M01035872-I1.
MODIFICATION TO EXISTING PLUMBING AND SPRINKLER SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
INTERIOR ALTERATIONS TO EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS
MODIFICATION TO EXISTING PLUMBING AND SPRINKLER SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
HEREBY FILING FOR THE RENOVATION OF EXISTING COMMERCIAL SPACE (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PROPOSAL TO INSTALL AN ILLUMINATED, NON-FLASHING, ACCESSORY BUSINESS SIGN FOR COMMERCIAL TENANT CHIP CITY. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. WORDING: *logo* CHIP CITY *logo*.
ENTIRE BUILDING
HEREBY FILING FOR THE RENOVATION OF EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of new water closets and lavatories with electric instant hot water heaters. Post approval amendment filed herewith to indicate 'Ground Floor' on the Drawings P-101.01 and P-102.01. No change to egress use or occupancy.
Construction of new interior non-bearing partitions. Modifications to existing storefront. No change in egress use or occupancy.
Installation of plywood sidewalk fence. No change to egress use or occupancy
IN-KIND REPLACEMENT HVAC SPLIT SYSTEM (7.5 TON) ON THE ROOF FOR THE ELEVATOR MACHINE ROOM.
LIGHTING UPGRADES FOR BANK OF AMERICA AT THIS LOCATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
HEREBY FILING FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Judgment: NO