200 EAST 61 STREET, Manhattan, NY, 10065 · New York City · 39 total events
Installation of suspended scaffold for facade work or inspection.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
APARTMENT ONLY
CABINET
DAMP SPOT
INSTALL EXTERIOR ILLUMINATED WALL SIGN (VAURA)
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (VAURA)
MODIFICATION OF EXISTING SPRINKLER SYSTEM ON PART OF CELLAR, 1ST AND 2ND FLOORS IN RETAIL SPACE, BLINDS TO GO. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
GENERAL CONSTRUCTION CONSISTING OF BALCONY SLAB AND RAILING REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of suspended scaffold for facade work or inspection
8853 - Installation of Convenience stair in an existing opening created under application M00959903-S1. No change to egress use group or occupancy group.Professional Cert Requested.
8853- Plumbing work associated with build out of Blinds To Go Retail Space. No change in egress use group or occupancy.
8853 - Mechanical System modifications associated with interior buildout of retail space, Blinds to Go, . No change in egress use group or occupancy group. Procert requested.
8853 - Interior buildout of retail space, Blinds to Go, Work to include floor coverings, Millwork, Fixtures, interior non bearing partitions reflective ceiling grid etc.. No change in egress use group or occupancy group.
8853- Construct Construction fence within 3 feet of property line. No change in egress use group or occupancy. Professional Certification Request.
Replacement of existing bathroom fixtures at same location at apartment 36E.
STRUCTURAL WORK IN CONJUNCTION WITH RENOVATION OF COMMERCIAL SPACE ON FIRST AND SECOND FLOORS TO INCLUDE REMOVAL OF CONVENIENCE STAIRS, INFILL OF SLAB, AND REMOVAL OF SLAB FOR NEW STAIR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installation of suspended scaffold for facade work or inspection . AMENDMENT#1: added scaffold drops
Interior renovation of existing bathrooms
PLUMBING DEMO/RELOCATION IN CONJUNCTION WITH INTERIOR RENOVATION OF COMMERCIAL SPACE IN CELLAR, FIRST, AND SECOND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
PARTIAL REMOVAL OF MECHANICAL SYSTEMS IN CONJUNCTION WITH INTERIOR RENOVATION OF COMMERCIAL SPACE IN CELLAR, FIRST, AND SECOND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
SPRINKLER REMOVAL AND INSTALL OF TEMPORARY CORE SPRINKLER PROTECTION IN CONJUNCTION WITH INTERIOR RENOVATION OF COMMERCIAL SPACE IN CELLAR, FIRST, AND SECOND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
GENERAL CONSTRUCTION WORK TO INCLUDE INSULATION OF METAL HATCH AND REPLACEMENT OF WATERPROOFING IN THE SAME AREA FOR FREIGHT ELEVATOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
MECHANICAL WORK IN CONJUNCTION WITH FREIGHT ELEVATOR REPLACEMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
STRUCTURAL WORK IN CONJUNCTION WITH FREIGHT ELEVATOR REPLACEMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
GENERAL CONSTRUCTION WORK TO INCLUDE DEMO OF CONVENIENCE STAIRS., NON-LOAD BEARING PARTITIONS AND DOORS OF COMMERCIAL SPACE IN CELLAR, FIRST AND SECOND FLOORS, INSTALL OF DEMISING WALL, AND SLAB REMOVAL FOR NEW STAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANC
GENERAL CONSTRUCTION WORK TO INCLUDE DEMO OF NON-LOAD BEARING PARTITIONS AND DOORS OF COMMERCIAL SPACE IN CELLAR, FIRST AND SECOND FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
APPLICATION AND PLANS FILED HEREWITH FOR APARTMENT 35-E. WORK TO INCLUDE KITCHEN AND BATHROOM UPDATES, THE INSTALLATION, REPLACEMENT AND RELOCATION OF PLUMBING FIXTURES AS PER PLANS. THERE IS NO CHANGE TO THE USE, EGRESS OR OCCUPANCY.
Application filing for General Construction work and cosmetic updated to apartment 35-E. Work to include new flooring, cabinets and mill work. There is no change to the use, egress occupancy.
FS8-- General construction and mechanical modifications including interior demo and partitions installation. No change to use, egress, or occupancy.
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN ON INTERIOR SOFFIT WALL. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN ON INTERIOR SOFFIT WALL. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN ON INTERIOR SOFFIT WALL. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
RELOCATION OF KITCHEN SINK, REMOVAL OF RANGE (REPLACEMENT WITH ELECTRIC), REPLACEMENT OF PLUMBING FIXTURES IN EXISTING ROUGHING
RELOCATION OF EXISTING KITCHEN, MINOR PARTITION WORK, FINISHES. REPLACEMENT OF PLUMBING FIXTURES UNDER SEPARATE DOBNow APPLICATION
INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE 1st ROOM FROM NORTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX SIGN MISSING AT PUBLIC HALL, 1st STORY
Judgment: NO