20 RIVER TERRACE, Manhattan, NY, 10282 · New York City · 82 total events
Installation of suspended scaffold for facade work or inspection.
2 infested unit(s) reported
IRA to assist with Condition Assessment
Plumbing work proposed to an existing Class A apartment. There will be no change of use, occupancy, or egress under this application.
Plumbing work for combination of unit 24 AB on 22nd floor construction (24th floor marketing). Scope of work includes combining two adjacent kitchens to become one larger kitchen. Combine dwelling units per DOB Technical Policy Procedure Notice # 3/199
Sprinkler work for combination of unit 24 AB on 22nd floor construction (24th floor marketing).
Mechanical work for removal of existing toilet exhaust ductwork for combination of unit 24 AB on 22nd floor construction (24th floor marketing).
Interior demolition and construction for combination of unit 24 AB on 22nd floor construction (24th floor marketing). Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997
INTERIOR RENOVATION TO APARTMENT 8DE. WORK TO INCLUDE ADDITION OF INTERIOR NON-BEARING PARTITION AND METAL &GLASS SYSTEM, CUSTOM MILLWORK AND NEW INTERIOR FINISHES. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Minor Renovation to an existing Class A apartment. Architectural work proposed as per plans filed herewith. No exterior or structural work proposed. There will be no change of use, occupancy, or egress under this application.
HEREWITH FILING FOR PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
Apt 25C — Possession
interior demolition and construction for combination of unit 14AB & Q on 12th floor construction (14th floor marketing). Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997
Mechanical work for removal of existing kitchen exhaust ductwork for combination of unit 14AB & Q on 12th floor construction (14th floor marketing).
plumbing work for combination of unit 14AB & Q on 12th floor construction (14th floor marketing)
sprinkler work for unit 8 D/E on 7th floor construction (8th floor marketing)
Plumbing work for unit 8 D/E on 7th floor construction (8th floor marketing)
Interior demolition and construction for combination of unit 8 D/E on 7th floor construction (8th floor marketing). Combine dwelling units per DOB Technic
mechanical work for unit 8 D/E on 7th floor construction (8th floor marketing)
plumbing work for combination of unit 3 G/H on 2nd floor construction (3rd floor marketing).
interior demolition and construction for combination of unit 28 C/D on 26th construction floor.. Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997
mechanical work to remove kitchen exhaust duct and cap main duct riser for combination of unit 28 C/D on 26th construction floor.
mechanical work to remove kitchen exhaust duct and cap main duct riser for combination of unit 3 G/H on 2nd floor construction (3rd floor marketing).
Interior demolition and construction for combination of unit 3 G/H on 2nd floor construction (3rd floor marketing). Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997
Sprinkler work for combination of unit 3 G/H on 2nd floor construction (3rd floor marketing).
plumbing work for combination of unit 28 C/D on 26th construction floor..
Sprinkler work for combination of unit 28 C/D on 26th construction floor.
general construction for residential common corridors
MOLD
sprinkler work for combination of apartments 15 K/L
sprinkler work for combination of apartments 27 B/C
MODIFICATION OF EXIST SPRINKLER HEAD LAYOUT THROUGHOUT THE SPACE TO ACCOMODATE NEW COMBINED APARTMENT 15DE LAYOUT. NO SCOPE IN STANDPIPE. THIS APPLICATION IS FILED IN CONJUNCTION WITH JOB # M08001413.
mechanical work to cut back and cap kitchen exhaust duct for combination of apartment 27 B/C
interior demolition and construction for combination of unit 27 B/C on 27th floor.. Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997
mechanical work to replace existing grilles in kind. Cut back and cap kitchen exhaust duct from the removed kitchen. Extend outside air supply ducts to the new finished wall for combination of apartments 15 K/L
interior demolition and construction for combination of unit 15 K/L on 15th floor.. Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997
plumbing work for combination of apartment 27B/C
plumbing work for combination of apartments 15 K/L
interior demolition and construction for combination of apt 16 D/E
interior demolition and construction for combination of unit PHD/PHE on 27th floor.. Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997
Cut back and cap one kitchen exhaust duct. Re-route one kitchen exhaust duct. Replace all diffusers in kind for combination of apartment 10 N/P
Interior demolition and construction for combination of apt 10 N/P. Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997.
mechanical for combination of apartment PHD/PHE on 27th floor
Cut back section of duct & replace all existing diffusers for combination of apartment 22 E/F
interior demolition and construction for combination of Unit 22 E/F. Combine dwelling units per DOB Technical Policy Procedure Notice # 3/1997
Sprinkler plans for the removal, relocation and installation for Renovation of once existing dwelling unit (APT# 25EF) on the 25th floor. No change to use, occupancy or egress.
interior Plumbing renovation - removal, relocation, replace and installation of once existing dwelling unit (APT# 25EF) on the 25th floor. No change to use, occupancy or egress.
Renovation of once existing dwelling unit (APT# 25EF) on the 25th floor. No change to use, occupancy or egress.
RENOVATION OF KITCHEN AND TWO BATHROOMS. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
BATH 1: REPL LAV, WC, NEW SHOWER IN TUB LOCATION. BATH 2: REPL LAV, WC, TUB. KITCHEN REPL SINK, DW, & GAS RANGE WITH GAS COOKTOP.